Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3700 S CALLE POLAR
Apply Date:
11/13/2018
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - ESPERANZA EN ESCALANTE, buildings 1-18 - PHASE II. Residential care services co

Permit Reviews

Permit Number - DP18-0277
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - ESPERANZA EN ESCALANTE, buildings 1-18 - PHASE II. Residential care services co
Start Date Submittal Complete Date Status  
01/24/2019 DEV PKG - RESUBMITTAL 03/01/2019 COMPLETED Review Details
03/22/2019 DEV PKG - RESUBMITTAL 04/03/2019 COMPLETED Review Details
09/21/2020 DEV PKG - OK TO SUBMIT 09/28/2020 COMPLETED Review Details
09/28/2020 REVISION - - 1ST 09/28/2020 COMPLETED Review Details
09/28/2020 REVISION - - 2ND 10/01/2020 COMPLETED Review Details
10/09/2018 DEV PKG - OK TO SUBMIT 11/14/2018 COMPLETED Review Details
11/14/2018 DEV PKG 12/18/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0277
Permit Description: SITE/GRADING/SWPPP - ESPERANZA EN ESCALANTE, buildings 1-18 - PHASE II. Residential care services co
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/06/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
09/17/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/29/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Walk site with GC went over staking of trees per plan adding rip rap making sure all trees are installed for the area called in for inspection.} ; {Activity date: 06/16/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Working on landscaping on east side of site in between houses.} ; {Activity date: 06/12/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
09/17/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - }
09/17/2020 SITE - Stormwater Follow-up Passed {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/27/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No track out on the roads at this time.

} ; {Activity date: 08/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No track out and no concerns at this time.} ; {Activity date: 08/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No track out from site on the street at this time.} ; {Activity date: 08/04/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No track out on street from rain activity.} ; {Activity date: 07/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No track out.} ; {Activity date: 02/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Walk site with GC went over controls that need to be added at catch basins clean up concrete around site repair concrete washout clean streets. Pick up trash around site.Before next inspection.} ; {Activity date: 02/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Walk site with GC went over controls that need to be added at catch basins clean up concrete around site repair concrete washout clean streets. Pick up trash around site.Before next inspection.} ; {Activity date: 11/20/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 10/22/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by KROBLES1 - stormwater follow up inspection. Continue. No concerns at this time.} ; {Activity date: 10/03/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/19/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PMARTIN1 - Walk site with general contractor went over small repairs.}
09/17/2020 ENGR Grading Final Passed {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - }
09/17/2020 SITE - Stormwater Final Inspection Passed {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/15/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Waiting on certification for basin.}
09/17/2020 COT - ENGR - Signage Final Passed {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - }
09/30/2020 ENGR Engineering Final Passed {Activity date: 09/30/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved. Had conversation with Steve Shields About field verifying parking spaces if OK OK to approve.} ; {Activity date: 09/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue.} ; {Activity date: 09/17/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. OK for TCO only. Provide revisions for all changes to approve plans approved by the city of Tucson. Complete all stabilization.Replace all dead trees. Replace sidewalks over 2% complete all notes from past inspections. List may not be complete pending revisions.} ; {Activity date: 09/16/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready Walks site today with Kevin from Cypress . Dave Roberts and GC. Went over work to be completed for finals. And revisions for all changes to development package.
} ; {Activity date: 09/15/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. Walk site checked sidewalks and ADA parking. Some sidewalks over 2% went over it with Mark. Stabilization of disturbed soil during construction lay down yard. Install Ballard in basin for sediment detection. Complete landscaped areas and rip rap per approved plans.Provide COT approved revisions for all changes to development package.} ; {Activity date: 09/15/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Walk site checked sidewalks and ADA parking. Some sidewalks over 2% went over it with Mark. Stabilization of disturbed soil during construction lay down yard. Install Ballard in basin for sediment detection. Complete landscaped areas and rip rap per approved plans. Provide COT approved revisions for all changes to approved development package.}
10/15/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 10/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/19/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
REVISION_LETTER, 09.21.20.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
GGC LETTER OF INTENT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
DP18-0277_ADDRESSING COMMENTS.PDF DOCUMENTS VIEW
ARCHITECTURAL_SITE_PLAN_ADDRESSING_REF.PDF DOCUMENTS VIEW
COMMENT_RESPONSE.PDF DOCUMENTS VIEW
DRAINAGE_REPORT.PDF DOCUMENTS VIEW
FP_PHASE_II_2019-01-15.PDF DOCUMENTS VIEW
SPECIAL_EXCEPTION_MEMO.PDF DOCUMENTS VIEW
COMMENT_RESPONSE LTR, 03.22.2019.PDF DOCUMENTS VIEW
LETTER FROM CITY OF TUCSON, 04.18.19.PDF DOCUMENTS VIEW
1-22 OF 22.PDF DEVELOPMENT PACKAGE VIEW