Permit: DP18-0277
Permit Details
Status:
Complete
Type:
Development Package
Address:
3700 S CALLE POLAR
Address NEW:
3700 S CALLE POLAR
Apply Date:
11/13/2018
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - ESPERANZA EN ESCALANTE, buildings 1-18 - PHASE II. Residential care services co
Permit Reviews
Permit Number - DP18-0277
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - ESPERANZA EN ESCALANTE, buildings 1-18 - PHASE II. Residential care services co
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2019 | DEV PKG - RESUBMITTAL | 03/01/2019 | COMPLETED |
| 03/22/2019 | DEV PKG - RESUBMITTAL | 04/03/2019 | COMPLETED |
| 09/21/2020 | DEV PKG - OK TO SUBMIT | 09/28/2020 | COMPLETED |
| 09/28/2020 | REVISION - - 1ST | 09/28/2020 | COMPLETED |
| 09/28/2020 | REVISION - - 2ND | 10/01/2020 | COMPLETED |
| 10/09/2018 | DEV PKG - OK TO SUBMIT | 11/14/2018 | COMPLETED |
| 11/14/2018 | DEV PKG | 12/18/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0277
Permit Description: SITE/GRADING/SWPPP - ESPERANZA EN ESCALANTE, buildings 1-18 - PHASE II. Residential care services co
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
| 09/17/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/29/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Walk site with GC went over staking of trees per plan adding rip rap making sure all trees are installed for the area called in for inspection.} ; {Activity date: 06/16/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Working on landscaping on east side of site in between houses.} ; {Activity date: 06/12/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
| 09/17/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } | |
| 09/17/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/27/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No track out on the roads at this time. } ; {Activity date: 08/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No track out and no concerns at this time.} ; {Activity date: 08/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No track out from site on the street at this time.} ; {Activity date: 08/04/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No track out on street from rain activity.} ; {Activity date: 07/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No track out.} ; {Activity date: 02/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Walk site with GC went over controls that need to be added at catch basins clean up concrete around site repair concrete washout clean streets. Pick up trash around site.Before next inspection.} ; {Activity date: 02/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Walk site with GC went over controls that need to be added at catch basins clean up concrete around site repair concrete washout clean streets. Pick up trash around site.Before next inspection.} ; {Activity date: 11/20/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 10/22/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by KROBLES1 - stormwater follow up inspection. Continue. No concerns at this time.} ; {Activity date: 10/03/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/19/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PMARTIN1 - Walk site with general contractor went over small repairs.} |
|
| 09/17/2020 | ENGR Grading Final | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } | |
| 09/17/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/15/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Waiting on certification for basin.} | |
| 09/17/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } | |
| 09/30/2020 | ENGR Engineering Final | Passed | {Activity date: 09/30/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved. Had conversation with Steve Shields About field verifying parking spaces if OK OK to approve.} ; {Activity date: 09/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue.} ; {Activity date: 09/17/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. OK for TCO only. Provide revisions for all changes to approve plans approved by the city of Tucson. Complete all stabilization.Replace all dead trees. Replace sidewalks over 2% complete all notes from past inspections. List may not be complete pending revisions.} ; {Activity date: 09/16/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready Walks site today with Kevin from Cypress . Dave Roberts and GC. Went over work to be completed for finals. And revisions for all changes to development package. } ; {Activity date: 09/15/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. Walk site checked sidewalks and ADA parking. Some sidewalks over 2% went over it with Mark. Stabilization of disturbed soil during construction lay down yard. Install Ballard in basin for sediment detection. Complete landscaped areas and rip rap per approved plans.Provide COT approved revisions for all changes to development package.} ; {Activity date: 09/15/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Walk site checked sidewalks and ADA parking. Some sidewalks over 2% went over it with Mark. Stabilization of disturbed soil during construction lay down yard. Install Ballard in basin for sediment detection. Complete landscaped areas and rip rap per approved plans. Provide COT approved revisions for all changes to approved development package.} |
|
| 10/15/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/19/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } |