Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0277
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - Approved. |
| 07/08/2020 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Partial approval. Walls for both trash enclosures OK walls only. |
| 06/12/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Rebar in footer for trashing closure on north end of sight OK. |
| 06/08/2020 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Partial approval. FaceTime Inspection for trash enclosure footer on south end of site. Rebar OK. Footer only. |
| 12/17/2019 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - Rebar for a catch basin at North end of site rebar Installed per approved plan. |
| 10/22/2019 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by KROBLES1 - grading rebar. Partial approval. Notes under other address for same activity number. |
| 09/19/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by PMARTIN1 - Catch basins on south west side of site for complete rebar OK. |
| 09/16/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by JSCHNEI2 - Approved. |
| 06/30/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity at this time. Working on landscaping and sidewalks. |
| 06/16/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Met with GC on site he ask about opening up part of the houses we talked about physical separation from construction and the public. Complete sidewalks in that area I’ll check with my smart level. Complete all work in area he wants to open firstAnd get with Armando about opening that area on the building side. |
| 06/05/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Stop by site got with GC about calling in for inspections work has started on trash Enclosures. |
| 05/27/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading on site at this time. |
| 11/19/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Provide revision for outlet pipe at basin on north end of site. |
| 09/06/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - install of 18 inch RCP from most southern catch basin on west side of site to third catch basin. |
| 09/17/2020 | ENGR Grading Final | rledonne | Approved | Entered by RLEDONN1 - |
| 09/17/2020 | ENGR Grading Final | rledonne | Approved | Entered by RLEDONN1 - |
| 07/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - grading check for activity. Walk site with GC went over sidewalks over 2% cross slope‘s. Walk site went over work that needs to be done for finals. |