Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP18-0277
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2020 | ENGR Engineering Final | rledonne | Approved | Entered by RLEDONN1 - |
| 09/30/2020 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RSALDAT1 - Approved. Had conversation with Steve Shields About field verifying parking spaces if OK OK to approve. |
| 09/28/2020 | ENGR Engineering Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. |
| 09/17/2020 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Partial approval. OK for TCO only. Provide revisions for all changes to approve plans approved by the city of Tucson. Complete all stabilization.Replace all dead trees. Replace sidewalks over 2% complete all notes from past inspections. List may not be complete pending revisions. |
| 09/16/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by JSCHNEI2 - Not ready Walks site today with Kevin from Cypress . Dave Roberts and GC. Went over work to be completed for finals. And revisions for all changes to development package. |
| 09/15/2020 | ENGR Engineering Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Walk site checked sidewalks and ADA parking. Some sidewalks over 2% went over it with Mark. Stabilization of disturbed soil during construction lay down yard. Install Ballard in basin for sediment detection. Complete landscaped areas and rip rap per approved plans.Provide COT approved revisions for all changes to development package. |
| 09/15/2020 | ENGR Engineering Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walk site checked sidewalks and ADA parking. Some sidewalks over 2% went over it with Mark. Stabilization of disturbed soil during construction lay down yard. Install Ballard in basin for sediment detection. Complete landscaped areas and rip rap per approved plans. Provide COT approved revisions for all changes to approved development package. |