Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
10/04/2018
Applicant:
Description:
SITE/GRADING - MCDONALD'S

Permit Reviews

Permit Number - DP18-0248
Permit Status: Complete
Permit Description: SITE/GRADING - MCDONALD'S
Start Date Submittal Complete Date Status  
05/13/2019 DEV PKG - REVISION 06/12/2019 COMPLETED Review Details
10/04/2018 DEV PKG - OK TO SUBMIT 10/12/2018 COMPLETED Review Details
10/04/2018 SITE and/or GRADING 11/05/2018 COMPLETED Review Details
11/09/2018 SITE and/or GRADING 05/14/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0248
Permit Description: SITE/GRADING - MCDONALD'S
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/26/2019 SITE - Stormwater Follow-up Passed {Activity date: 04/26/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - work is been completed there are no issues at this time.}
04/26/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 04/26/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - The work has already been completed.}
05/06/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/08/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - If owner wants to remove the two palm trees on patio I am OK with that}
05/06/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/06/2019 ENGR Grading Final Passed {Activity date: 05/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/06/2019 SITE - Stormwater Final Inspection Passed {Activity date: 05/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/06/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PER STEVE SHIELDS.} ; {Activity date: 04/26/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - It appears that there has been no previous inspections under this permit.} ; {Activity date: 01/15/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by CBELL1 - changed to PA due to other inspections}
05/06/2019 COT - ENGR - Signage Final Passed {Activity date: 05/06/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/17/2019 ENGR Engineering Final Passed {Activity date: 06/17/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/03/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } ; {Activity date: 04/26/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Complete the work shown on the plan including installing the handrail per CO T, PAG SD 105. Install curb stop in accessible spaces. Schedule inspection for both the DP and the combination permit at the same time.}

Documents

File Name Document Type  
001_COVER SHEET_C1.TIF DEVELOPMENT PACKAGE VIEW
002_DEMOLITION SITE PLAN_SP0.TIF DEVELOPMENT PACKAGE VIEW
003_SITE PLAN_SP1.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING PLAN_C2.TIF DEVELOPMENT PACKAGE VIEW
005_ACCESSIBILITY DETAILS_AS1.TIF DEVELOPMENT PACKAGE VIEW
006_SITE DETAILS_SD1.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE PLAN_L01.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE DETAILS_L02.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
EMAIL STEVE SHIELDS.PDF DOCUMENTS VIEW
REVISION LTR, 05.13.19.PDF DOCUMENTS VIEW