06/17/2019 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
05/03/2019 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by CBELL1 - |
04/26/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by CBELL1 - Complete the work shown on the plan including installing the handrail per CO T, PAG SD 105. Install curb stop in accessible spaces. Schedule inspection for both the DP and the combination permit at the same time. |
06/17/2019 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
05/06/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by CBELL1 - Provide revisions from planning and development services for ramp on golf links north west corner per Steve shields for final. |
05/03/2019 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by CBELL1 - Need to talk to inspector from last inspection for all details. |
04/26/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by CBELL1 - Complete the work shown on the plan including installing the handrail per CO T, PAG SD 105. Install curb stop in accessible spaces. Schedule inspection for both the DP and the combination permit at the same time. |