Permit Details

Status:
Complete
Type:
Development Package
Address:
7401 S WILMOT RD
Apply Date:
10/03/2018
Applicant:
Description:
E SITE/GRADE/SWPPP - ABRAZO MICRO HOSPITAL

Permit Reviews

Permit Number - DP18-0247
Permit Status: Complete
Permit Description: E SITE/GRADE/SWPPP - ABRAZO MICRO HOSPITAL
Start Date Submittal Complete Date Status  
02/07/2019 DEV PKG - RESUBMITTAL 03/01/2019 COMPLETED Review Details
10/03/2018 DEV PKG - OK TO SUBMIT 10/05/2018 COMPLETED Review Details
10/10/2018 DEV PKG 12/14/2018 COMPLETED Review Details
12/18/2018 DEV PKG - RESUBMITTAL 01/23/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP18-0247
Permite Description: E SITE/GRADE/SWPPP - ABRAZO MICRO HOSPITAL
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/10/2020 COT - FCON - Sprinkler - Final N/A Canceled {Activity date: 01/10/2020; Status: Not Applicable; Inspector: jvincent; Comment: Entered by JVINCEN1 - }
01/10/2020 COT - FCON - Fire - Final N/A Canceled {Activity date: 01/10/2020; Status: Not Applicable; Inspector: jvincent; Comment: Entered by JVINCEN1 - }

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0247
Permit Description: E SITE/GRADE/SWPPP - ABRAZO MICRO HOSPITAL
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/07/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 06/07/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
06/07/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/07/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
04/23/2020 SITE - Stormwater Follow-up Passed {Activity date: 04/23/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - No concerns at this time} ; {Activity date: 03/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - No concerns at this time} ; {Activity date: 03/11/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Met with GC about adding temporary controls to curb openings} ; {Activity date: 03/11/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Continue. Met with GC about adding temporary controls to curb openings} ; {Activity date: 02/19/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site with GC went over a couple of small items to repair and controlled.} ; {Activity date: 01/29/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walks site with GC went over some corrections on east end of sight. Provide designated concrete washout on site.} ; {Activity date: 12/31/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with GC about adding rock to entrance.} ; {Activity date: 12/18/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walks site with GC no concerns at this time.} ; {Activity date: 12/04/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - . Walk site with GC talked about Repairing controls on south west corner of sight. And adding track out rock to entrance.} ; {Activity date: 12/04/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Walk site with GC talked about Repairing controls on south west corner of sight. And adding track out rock to entrance.} ; {Activity date: 11/20/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 11/06/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 10/23/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site with general contractor no concerns at this time.} ; {Activity date: 10/09/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME FOR THE STORMWATER CONTROLS. I HAVE ADVISED THE CONTRACTORS THAT THEY NEED TO CLEANUP CONCRETE SPOIL PILES ON THE SITE FROM TODAYS POUR. I HAVE ALSO ASKED TO EITHER CONSTRUCT A WASHOUT AREA OR CONTRACT THIS SERVICE OUT SINCE THEY ARE IN VIOLATION OF THE STORMWATER ORDINANCE AT THIS TIME AND CAN BE SITED BY ADEQ IF IT IS NOT CLEANED UP ASAP. I WILL ASKED RON LEDONNE TO CHECK THIS SITE OUT ON FRIDAY WHEN HE RETURNS TO ENSURE THAT THE CLEANUP HAS TAKEN PLACED AS DIRECTED} ; {Activity date: 09/25/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/11/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Corrections were made from last inspection report.} ; {Activity date: 08/28/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site with GC went over corrections needed for temporary controls on North West side of site.} ; {Activity date: 08/14/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME FOR THIS SITE.} ; {Activity date: 07/31/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 07/16/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site with GC all controls look good. Broken hydraulic line on Back hoe. Hazardous spill kit on site. No other concerns at this time.} ; {Activity date: 06/27/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - What side of the general contractor and third party Storm water inspector. No concerns at this time.}
04/23/2020 ENGR Grading Final Passed {Activity date: 04/23/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - } ; {Activity date: 03/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - }
05/12/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/12/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/12/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/12/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/12/2020 SITE - Stormwater Final Inspection Passed {Activity date: 05/12/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/12/2020 COT - ENGR - Signage Final Passed {Activity date: 05/12/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/13/2020 ENGR Engineering Final Passed {Activity date: 05/13/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/12/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Complete all striping installation of wheel stops. Provide certification letter with seal from engineer of record For all grading and drainage per approved plans.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER OF INTENT.PDF DOCUMENTS VIEW
APPLICATION_SIGNED.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
1_DP18-0247_ADDRESSING.PDF DOCUMENTS VIEW
ADOT-COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
ARC COMPLIANCE LETTER.PDF DOCUMENTS VIEW
ENGINEERING JOHN VAN WINKLE-COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
LANDSCAPE ANDREW CONNOR-COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
PLANNING - ALEXANDRA HINES -COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
PLUMBING -COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
TRAFFIC ZELIN CANCHOLA-COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
TRAFFIC STATEMENT_20181206.PDF DOCUMENTS VIEW
TUCSON AIRPORT - SCOTT ROBIDOUX-COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
ZONING DAVID RIVERA-COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
ADDRESSING ROBIN FREIMAN-COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
2_ADDRESSING COMMENTS.PDF DOCUMENTS VIEW
ADDRESSING COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
ENGINEERING COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
FINAL DRAINAGE REPORT.PDF DOCUMENTS VIEW
LOT SPLIT, PIMA CO. ASSESSOR LETTER.PDF DOCUMENTS VIEW
PLUMBING COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
ZONING COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
1-30 OF 30.PDF DEVELOPMENT PACKAGE VIEW