Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0247

Parcel: 141367940


Addresses:

7401 S WILMOT RD


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP18-0247

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
04/23/2020 SITE - Stormwater Follow-up RLEDONNE Approved Entered by RSALDAT1 -
03/25/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by SFLORES2 - No concerns at this time
03/25/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by SFLORES2 - No concerns at this time
03/11/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by SFLORES2 - Met with GC about adding temporary controls to curb openings
03/11/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by SFLORES2 - Continue. Met with GC about adding temporary controls to curb openings
02/19/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC went over a couple of small items to repair and controlled.
01/29/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Walks site with GC went over some corrections on east end of sight. Provide designated concrete washout on site.
12/31/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Met with GC about adding rock to entrance.
12/18/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Walks site with GC no concerns at this time.
12/04/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by SFLORES2 - . Walk site with GC talked about Repairing controls on south west corner of sight. And adding track out rock to entrance.
12/04/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by SFLORES2 - Walk site with GC talked about Repairing controls on south west corner of sight. And adding track out rock to entrance.
11/20/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - No concerns at this time.
11/06/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - No concerns at this time.
10/23/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Walk site with general contractor no concerns at this time.
10/09/2019 SITE - Stormwater Follow-up DROBERTS Continued Entered by DMERANZ1 - NO CONCERNS AT THIS TIME FOR THE STORMWATER CONTROLS. I HAVE ADVISED THE CONTRACTORS THAT THEY NEED TO CLEANUP CONCRETE SPOIL PILES ON THE SITE FROM TODAYS POUR. I HAVE ALSO ASKED TO EITHER CONSTRUCT A WASHOUT AREA OR CONTRACT THIS SERVICE OUT SINCE THEY ARE IN VIOLATION OF THE STORMWATER ORDINANCE AT THIS TIME AND CAN BE SITED BY ADEQ IF IT IS NOT CLEANED UP ASAP. I WILL ASKED RON LEDONNE TO CHECK THIS SITE OUT ON FRIDAY WHEN HE RETURNS TO ENSURE THAT THE CLEANUP HAS TAKEN PLACED AS DIRECTED
09/25/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - No concerns at this time.
09/11/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Corrections were made from last inspection report.
08/28/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC went over corrections needed for temporary controls on North West side of site.
08/14/2019 SITE - Stormwater Follow-up DROBERTS Continued Entered by DMERANZ1 - NO CONCERNS AT THIS TIME FOR THIS SITE.
07/31/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - No concerns at this time.
07/16/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC all controls look good. Broken hydraulic line on Back hoe. Hazardous spill kit on site. No other concerns at this time.
06/27/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - What side of the general contractor and third party Storm water inspector. No concerns at this time.