Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0247
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - |
03/25/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - |
03/25/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - |
04/23/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - |
04/16/2020 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Working on landscaping installing ADA parking signs at this time. |
04/15/2020 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Walks site with general contractor by FaceTime checked all curb openings riprap transfer pipe on North basins. |
04/14/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue sidewalks OK from property line into building. ADA parking on south side of buildingPer approved plans slopes OK. ADA parking on north side of building over 2%. Checked rip rap curb openings on west side of building. |
04/08/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - still under construction |
04/08/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - |
04/06/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by VFLORES1 - Contractor unable to be on site |
04/02/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Talk to GC calling back in Monday for inspection |
04/02/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Striping Not complete at this time. Talk to GC calling back in Monday for inspection. |
03/25/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Percentage on sidewalks north and south of building under 2% for cross slopes. |
03/25/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Percentage on sidewalks north and south of building under 2% for cross slopes |
03/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Walk site with GC went over work to complete. Went over certification letter for trashing closure Per Dave Roberts. |
03/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Walk site with GC went over work to complete. Went over certification letter for trashing closure Per Dave Roberts. |
03/10/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with GC working on sidewalks spreading AB In driveway and parking areas. |
02/19/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Working on grading parking area and entrances in right away. |
01/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Rebar for trashing closure per approved plans. |
01/13/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - No Grading activity at this time. |
08/14/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - CREWS CONTINUE TO WORK ON UNDERGROUND UTILITIES AN PREPARING THE AREAS FOR THE FOUNDATION AND SLAB WORK. |
10/09/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - THE WORK ON THIS SITE IS MAINLY ON THE BUILDING GOING VERTICAL, VERY LITTLE SITE WORK. I HAVE ADVISED THE CONTRACTORS THAT THEY NEED TO CLEANUP CONCRETE SPOIL PILES ON THE SITE FROM TODAYS POUR. I HAVE ALSO ASKED TO EITHER CONSTRUCT A WASHOUT AREA OR CONTRACT THIS SERVICE OUT SINCE THEY ARE IN VIOLATION OF THE STORMWATER ORDINANCE AT THIS TIME AND CAN BE SITED BY ADEQ IF IT IS NOT CLEANED UP ASAP. |
06/07/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Working on rough grading at this time. |
04/23/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - |
12/23/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Walk site with GC went over approved plans no concerns at this time. |
12/23/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Walk site with GC went over approved plans no concerns at this time. |
06/05/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Met with GC about setting up preconstruction meeting grading work is already started on site. |
07/09/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE. |
05/23/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - No grading activity on site at this time. |
03/06/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
02/22/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
02/07/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY. |
01/23/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
01/03/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY . |
12/10/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
11/30/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
11/16/2018 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - NO ACTIVITY. |
11/01/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
04/23/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - Letter supplied by architect John Van Winkle excepted for not putting rebar in the approach at the trashing closure per Dave Roberts. |
03/11/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by SFLORES2 - Met with GC about not putting rebar at ramp for trashing closure produced a letter from someone stating that they did not need it. They have had the standard detail in their possession since the preconstruction meeting. No. 6-01.0 . |
03/11/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by SFLORES2 - Met with GC about not putting rebar at ramp for trashing closure produced a letter from someone stating that they did not need it. They have had the standard detail in their possession since the preconstruction meeting. No. 6-01.0 . |
03/10/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Approach for trash enclosure concrete poured before able to inspect rebar. |
02/26/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Rebar in Walls for trash enclosure OK. |
02/26/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Rebar in Walls for trash enclosure OK. |
01/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Rebar for trashing closure per approved plans. |
11/13/2019 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - Rebar for trash enclosure footer installed per approved plan. |