Permit: DP18-0235
Permit Details
Apply Date:
09/18/2018
Applicant:
Description:
E SITE/GRADING/SWPPP - Project Cactus
Permit Reviews
Permit Number - DP18-0235
Permit Status: Complete
Permit Description: E SITE/GRADING/SWPPP - Project Cactus
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2019 | DEV PKG - REVISION | 03/01/2019 | COMPLETED |
03/11/2019 | DEV PKG - REVISION | 03/25/2019 | COMPLETED |
07/15/2019 | REVISION - - 2ND | 08/16/2019 | COMPLETED |
09/18/2018 | DEV PKG - OK TO SUBMIT | 11/30/2018 | COMPLETED |
09/21/2018 | DEV PKG | 11/14/2018 | COMPLETED |
10/31/2018 | DEV PKG - RESUBMITTAL | 11/28/2018 | COMPLETED |
11/29/2018 | DEV PKG - RESUBMITTAL | 12/06/2018 | COMPLETED |
12/06/2018 | DEV PKG - RESUBMITTAL | 12/06/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0235
Permit Description: E SITE/GRADING/SWPPP - Project Cactus
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/10/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
07/10/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 07/10/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
08/23/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
08/23/2019 | ENGR Engineering Final | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/11/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with the general contractor at 210-844-6272. We discussed the final corrections previously noted and I informed him that several of the catch basinās still have Plastic covering the openings.} ; {Activity date: 07/10/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor not answering his phone. Provide city approved plan revisions for any and all changes including accessible route from Silverlake. provide a letter certifying all grading for this site. Make notes corrections, including sidewalk scupper at front entrance and trash enclosure corrections. Provide the letter from your engineer of record stating that the trash enclosure was installed per city of Tucson standard detail 6.01 Install the bicycle parking as required. Remove all stormwater protections from catch basins and provide your NOI. Remove the temporary fencing that is blocking the pedestrian access from Silverlake.} |
|
08/23/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/02/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is some track out present, Brandon with Catamount has been asked to keep the streets clean, and to keep an eye on existing driveways on to Silverbell Road.} | |
08/23/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/10/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor not answering his phone. Provide city approved plan revisions for any and all changes including accessible route from Silverlake. provide a letter certifying all grading for this site. Make notes corrections, including sidewalk scupper at front entrance and trash enclosure corrections. Provide the letter from your engineer of record stating that the trash enclosure was installed per city of Tucson standard detail 6.01 Install the bicycle parking as required. Remove all stormwater protections from catch basins and provide your NOI. Remove the temporary fencing that is blocking the pedestrian access from Silverlake.} ; {Activity date: 03/19/2019; Status: Prior to Final Inspectn; Inspector: JV; Comment: Entered by JVWINKL1 - Confirm basin drawdown time to be less than 12 hours} |
|
08/23/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/02/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Additional controls are needed at driveways there is some track out present} | |
08/23/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
08/26/2019 | ENGR Grading Final | Passed | {Activity date: 08/26/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by QJONES1 - APPROVED PER FINAL} |