Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0235

Parcel: 11811015Q


Addresses:

709 W SILVERLAKE RD


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP18-0235

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/23/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
07/11/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - I spoke with the general contractor at 210-844-6272. We discussed the final corrections previously noted and I informed him that several of the catch basin‘s still have Plastic covering the openings.
07/10/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor not answering his phone. Provide city approved plan revisions for any and all changes including accessible route from Silverlake. provide a letter certifying all grading for this site. Make notes corrections, including sidewalk scupper at front entrance and trash enclosure corrections. Provide the letter from your engineer of record stating that the trash enclosure was installed per city of Tucson standard detail 6.01 Install the bicycle parking as required. Remove all stormwater protections from catch basins and provide your NOI. Remove the temporary fencing that is blocking the pedestrian access from Silverlake.
08/23/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
07/11/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - I spoke with the general contractor at 210-844-6272. We discussed the final corrections previously noted and I informed him that several of the catch basin‘s still have Plastic covering the openings.
07/10/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor not answering his phone. Provide city approved plan revisions for any and all changes including accessible route from Silverlake. provide a letter certifying all grading for this site. Make notes corrections, including sidewalk scupper at front entrance and trash enclosure corrections. Provide the letter from your engineer of record stating that the trash enclosure was installed per city of Tucson standard detail 6.01 Install the bicycle parking as required. Remove all stormwater protections from catch basins and provide your NOI. Remove the temporary fencing that is blocking the pedestrian access from Silverlake.