Inspection Status: Passed
Inspection History: SITE - Stormwater Final Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 08/23/2019 |
SITE - Stormwater Final Inspection |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 07/10/2019 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Contractor not answering his phone.
Provide city approved plan revisions for any and all changes including accessible route from Silverlake. provide a letter certifying all grading for this site. Make notes corrections, including sidewalk scupper at front entrance and trash enclosure corrections. Provide the letter from your engineer of record stating that the trash enclosure was installed per city of Tucson standard detail 6.01
Install the bicycle parking as required. Remove all stormwater protections from catch basins and provide your NOI. Remove the temporary fencing that is blocking the pedestrian access from Silverlake. |
| 03/19/2019 |
SITE - Stormwater Final Inspection |
JV |
Prior to Final Inspectn |
Entered by JVWINKL1 - Confirm basin drawdown time to be less than 12 hours |