Permit: DP18-0233
Permit Details
Apply Date:
09/14/2018
Applicant:
Anthony Capps
Description:
E SITE/GRADING- BRAKE MAX 16
Permit Reviews
Permit Number - DP18-0233
Permit Status: Complete
Permit Description: E SITE/GRADING- BRAKE MAX 16
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/28/2019 | DEV PKG - RESUBMITTAL | 02/07/2019 | COMPLETED |
09/14/2018 | DEV PKG - OK TO SUBMIT | 09/20/2018 | COMPLETED |
09/20/2018 | DEV PKG | 11/28/2018 | COMPLETED |
12/03/2018 | DEV PKG - RESUBMITTAL | 01/11/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0233
Permit Description: E SITE/GRADING- BRAKE MAX 16
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/08/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues or concerns at this time} ; {Activity date: 04/29/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time} ; {Activity date: 03/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is minor check out to be noted on Tucson marketplace I spoke with Mike the GC about posting his signage for his SWPPP} ; {Activity date: 02/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor check out noted. Controls have been installed at Drive. } ; {Activity date: 02/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor Track out to be noted.} |
|
07/11/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
07/12/2019 | COT - FCON - Fire - Final | Passed | {Activity date: 07/12/2019; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by KROBLES1 - } | |
07/23/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
07/23/2019 | ENGR Grading Final | Passed | {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
07/23/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
07/23/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/20/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - I met Mike with MW Morisey on site, job is located next to the cost of fuel island. Provide SWPPP and install storm water system. Post your address. Schedule for installation of stormwater controls Schedule stormwater follow up inspections by weekly.} | |
07/23/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 07/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
07/24/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/23/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete riprap, clean up debris around storage shed, provide galvanize wire for tree staking. Install bicycle parking.} | |
07/24/2019 | ENGR Engineering Final | Passed | {Activity date: 07/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } |