Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0233

Parcel: 13213074A

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP18-0233

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
07/23/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by DMERANZ1 -
02/20/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CBELL1 - I met Mike with MW Morisey on site, job is located next to the cost of fuel island. Provide SWPPP and install storm water system. Post your address. Schedule for installation of stormwater controls Schedule stormwater follow up inspections by weekly.