Permit: DP18-0233

Parcel: 13213074A

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
07/24/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
07/24/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
07/23/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Complete riprap, clean up debris around storage shed, provide galvanize wire for tree staking. Install bicycle parking.
05/08/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Inspection was for pre-grout of trash enclosure walls.