Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9220 S HOUGHTON RD
Apply Date:
08/06/2018
Applicant:
Description:
E SITE/GRADE/SWPPP - DENNY'S AT HTC

Permit Reviews

Permit Number - DP18-0189
Permit Status: Complete
Permit Description: E SITE/GRADE/SWPPP - DENNY'S AT HTC
Start Date Submittal Complete Date Status  
08/03/2018 DEV PKG - OK TO SUBMIT 08/10/2018 COMPLETED Review Details
08/10/2018 DEV PKG 09/18/2018 COMPLETED Review Details
09/18/2018 DEV PKG - RESUBMITTAL 10/16/2018 COMPLETED Review Details
10/16/2018 DEV PKG - RESUBMITTAL 04/16/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0189
Permit Description: E SITE/GRADE/SWPPP - DENNY'S AT HTC
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/11/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/11/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/11/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 07/11/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/25/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by CBELL1 - THE TRACK OUT MATERIAL AND WADDLE FORTHE SITE AND ARE CURRENTLY WORK ON THE PAD GRADE.}
07/11/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/11/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/25/2019; Status: Cancelled; Inspector: DROBERTS; Comment: Entered by CBELL1 - MEETING WILL BE RESCHEDULED FOR A LATER DATE NEXT WEEK. THE CREWS HAVE INSTALLED THE TRACK OUT MATERIAL AND WADDLE FORTHE SITE AND ARE CURRENTLY WORKING ON THE PAD GRADE FOR THE BUILDING.}
09/13/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/13/2019; Status: Approved; Inspector: rledonn1; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/27/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete all riprap in curb openings. Provide approve staking of trees.}
09/13/2019 ENGR Engineering Final Passed {Activity date: 09/13/2019; Status: Approved; Inspector: rledonn1; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/11/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Call all other activities in complete all work on approved plans before calling for final grading. Met with GC on site went over development package plan. Informed GC to have NOI Information posted at entrance and have inspection reports on site. Repair waddle around the site.Clean up concrete on ground and provide concrete washout on site for concrete trucks.} ; {Activity date: 07/11/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Call all other activities in complete all work on approved plans before calling for final grading. Met with GC on site went over development package plan. Informed GC to have NOI Information posted at entrance and have inspection reports on site. Repair waddle around the site.}
09/13/2019 SITE - Stormwater Follow-up Passed {Activity date: 09/13/2019; Status: Approved; Inspector: rledonn1; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/18/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERN AT THIS TIME.} ; {Activity date: 07/12/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Concrete washout has been provided. Storm water controls have been repaired.}
09/13/2019 ENGR Grading Final Passed {Activity date: 09/13/2019; Status: Approved; Inspector: rledonn1; Comment: Entered by RLEDONN1 - }
09/13/2019 SITE - Stormwater Final Inspection Passed {Activity date: 09/13/2019; Status: Approved; Inspector: rledonn1; Comment: Entered by RLEDONN1 - }
09/13/2019 COT - ENGR - Signage Final Passed {Activity date: 09/13/2019; Status: Approved; Inspector: rledonn1; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
1_TYPE 3 CAPACTIY RESPONSE - 2018-190.PDF DOCUMENTS VIEW
FUGITIVE DUST.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
LETTER OF INTENT.PDF DOCUMENTS VIEW
NOI.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
1-16 OF 16.PDF DEVELOPMENT PACKAGE VIEW