Permit Number: DP18-0189
Parcel: 14118626A

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP18-0189
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/10/2018 KELLY LEE START PLANS SUBMITTED Completed
08/16/2018 MARTIN BROWN COT NON-DSD FIRE Approved
08/31/2018 MMORENO1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Michael Moreno
PDSD Zoning Review Section

PROJECT: Denny 9220 S. Houghton Road
Development Package (1st Review)
DP18-0189

TRANSMITTAL DATE: August 29, 2018
DUE DATE: September 7, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 3, 2018.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.3.0 FORMAT REQUIREMENTS


CONTENT REQUIREMENTS


2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat;

1. COMMENT: Revise legal description on the title block to match the proposed description on the lot split. Please add lot split number and documentation for S18-079 on the resubmittal of DP18-0189.

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: Provide the development package case number, DP18-0189, adjacent to the title block on each sheet.





2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned.

3. COMMENT: The proposed asphalt path on the lower southwest portion of the development must be concrete as stated in section 7-01.4.0 of the Technical Standards Manual.

2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

4. COMMENT: Please provide the sidewalk width and dimensions on the southern lot line of the site and the sidewalk connecting from East Service Drive to the proposed development site.

2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

5. COMMENT: All proposed and new signs will have to go through the permit process and will require a new permit.


If you have any questions about this transmittal, Contact Michael Moreno Monday thru Friday or by email Michael.Moreno@Tucsonaz.gov


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/31/2018 MMORENO1 ZONING HC REVIEW Passed
09/06/2018 ANDREW CONNOR LANDSCAPE REVIEW Approv-Cond ADMINISTRATIVE MANUAL
SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
The landscape plan will contain the following identification in the lower right corner of each sheet:
Any relevant case number for reviews or modifications that affect the site.
Ensure that all Zoning and Engineering comments and concerns are addressed.
Additional comments may apply
09/07/2018 LOREN MAKUS ENGINEERING REVIEW Reqs Change September 7, 2018
DP18-0189
1. Grading Note 3 has blanks for information regarding a geotechnical report for this project. Complete the note and provide a copy of the report.
2. Demonstrate on the grading plan and provide an explanation in the response letter how water harvesting will be maximized per UDC 7.6.6.C.2: "Grading, hydrology, and landscape structural plans must be integrated to make maximum use of site storm water runoff for supplemental on-site irrigation purposes. The landscape plan shall indicate use of all runoff, from individual catch basins around single trees to basins accepting flow from an entire vehicular use area or roof area."
3. Keynote 10 on sheet 6 indicates the use of a long-term bike locker. Show the extent of the locker and access on the plan view.
4. Keynote 9 on sheet 6 is for short term bike parking. Clearly show the short-term location and access on the plan view.
5. Make sure all labels and features match on all plan sheets.
09/07/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
09/11/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change Plan Returned for Corrections Notice: DP18-0189
This review has been completed and resubmittal is required. Please resubmit the following items to PDSD Filedrop https://www.tucsonaz.gov/file-upload-pdsd
1) Revised Plan Set
2) All items requested by review staff
3) All items needed to approve these plans
Please remember to name your files appropriately, for example:
Example 2 (second submittal):
2_plan_set.pdf
2_soils_report.pdf

Kelly Lee
Lead Planner
Planning & Development Services
(520) 837-6999

Final Status

Task End Date Reviewer's Name Type of Review Description
09/18/2018 AHINES2 OUT TO CUSTOMER Completed