Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/13/2019 |
ENGR Engineering Final
|
rledonn1 |
Approved |
Entered by RLEDONN1 - |
| 07/11/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Call all other activities in complete all work on approved plans before calling for final grading. Met with GC on site went over development package plan. Informed GC to have NOI Information posted at entrance and have inspection reports on site. Repair waddle around the site.Clean up concrete on ground and provide concrete washout on site for concrete trucks. |
| 07/11/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Call all other activities in complete all work on approved plans before calling for final grading. Met with GC on site went over development package plan. Informed GC to have NOI Information posted at entrance and have inspection reports on site. Repair waddle around the site. |
| 09/13/2019 |
ENGR Engineering Final
|
rledonn1 |
Approved |
Entered by RLEDONN1 - |
| 08/27/2019 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by DMERANZ1 - Provide sidewalk scuppers for roof drains in canopy on south side of building. Complete holes for hold back on trashing closure gates. Provide as Built for all changes to approve plans for all grading and drainage. Provide certification letter from the engineer of record for all grading and drainage. Engineering OK with TCO at this time. |