Permit: DP18-0158
Permit Details
Apply Date:
06/27/2018
Applicant:
Philip Veneziano
Description:
E SITE/GRADE - Complete Door Systems, warehouse
Permit Reviews
Permit Number - DP18-0158
Permit Status: Complete
Permit Description: E SITE/GRADE - Complete Door Systems, warehouse
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2019 | DEV PKG - REVISION | 03/25/2019 | COMPLETED |
| 06/27/2018 | DEV PKG - OK TO SUBMIT | 06/29/2018 | COMPLETED |
| 06/29/2018 | DEV PKG | 08/15/2018 | COMPLETED |
| 08/13/2018 | DEV PKG - RESUBMITTAL | 09/05/2018 | COMPLETED |
| 09/05/2018 | DEV PKG - RESUBMITTAL | 09/17/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0158
Permit Description: E SITE/GRADE - Complete Door Systems, warehouse
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/27/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE FOR PRE-CON.} ; {Activity date: 09/27/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - } | |
| 01/03/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/03/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 02/05/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Note landscaped areas shall be recessed 6in for water harvesting.} | |
| 02/05/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 02/05/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/03/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time.} ; {Activity date: 10/04/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - Controls are in place. There is no track out present at this time.} | |
| 02/05/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 02/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 03/21/2019 | ENGR Engineering Final | Passed | {Activity date: 03/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - The sidewalk issues have been resolved please remove the note from locks holds and notices} ; {Activity date: 02/20/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - It is OK to approve this permit after completing requirements and locks holds and notices.} ; {Activity date: 02/05/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Complete the rainwater downspout to Scupper connection. Clean up construction debris’s and stabilize unprotected dirt areas. Install the riprap as shown at downspouts and also riprap the north east landscape slope at the drainage canal} | |
| 03/21/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 04/04/2019 | ENGR Grading Final | Passed | {Activity date: 04/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by AVAUGHN1 - AP AS OF 9190} ; {Activity date: 02/05/2019; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/03/2019; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by CBELL1 - also 09170, 09172, 09174, are not applicable as there is no basin} |