Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by CBELL1 - |
| 02/05/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by CBELL1 - |
| 03/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by CBELL1 - The sidewalk issues have been resolved please remove the note from locks holds and notices |
| 02/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by CBELL1 - It is OK to approve this permit after completing requirements and locks holds and notices. |
| 02/05/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Complete the rainwater downspout to Scupper connection. Clean up construction debris’s and stabilize unprotected dirt areas. Install the riprap as shown at downspouts and also riprap the north east landscape slope at the drainage canal |