Permit: DP18-0158

Parcel: 12419011A


Addresses:

1870 E 18TH ST

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
02/05/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
01/03/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Contractor is grading the site 4 pavement
10/08/2018 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - I spoke with the property owner about his questions and I suggested that he have his architect talk to Steve Shields. I told him to have any changes documented thru plan review.
10/04/2018 ENGR Grading Final BBENEDON Continued Entered by CMURPHY1 - Contractor installing building slab at this time . I spoke with Steve at 395-5455 he is the owner. Check with Department of Transportation right-of-way regarding work in public right-of-way. Steve has questions with regard to public sidewalks and existing Bridge condition. Thanks Brian
03/21/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
03/21/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
04/04/2019 ENGR Grading Final BBENEDON Approved Entered by AVAUGHN1 - AP AS OF 9190
02/05/2019 ENGR Grading Final BBENEDON Not Applicable Entered by CBELL1 -
01/03/2019 ENGR Grading Final BBENEDON Not Applicable Entered by CBELL1 - also 09170, 09172, 09174, are not applicable as there is no basin