Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1910 E AERO PARK BL
Apply Date:
06/01/2018
Applicant:
Description:
SITE/GRADING - AZDPS HANGER

Permit Reviews

Permit Number - DP18-0131
Permit Status: Complete
Permit Description: SITE/GRADING - AZDPS HANGER
Start Date Submittal Complete Date Status  
06/01/2018 DEV PKG - OK TO SUBMIT 06/01/2018 COMPLETED Review Details
06/01/2018 SITE and/or GRADING 07/02/2018 COMPLETED Review Details
08/14/2018 SITE and/or GRADING 10/08/2018 COMPLETED Review Details

Conditions

Permit Number - DP18-0131
Permit Status: Complete
Permit Description: SITE/GRADING - AZDPS HANGER
Date Description Comments
09/19/2019 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
09/19/2019 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0131
Permit Description: SITE/GRADING - AZDPS HANGER
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/02/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/02/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/16/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
09/16/2019 SITE - Stormwater Follow-up Passed {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, MINOR TRACKOUT NOTED ON THE ONSITE PAVEMENT.}
09/16/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - RIP RAP AND DRAINAGE WAYS HAVE BEEN INSTALLED PRIOR TO THIS SITE VISIT. I WILL ASK BRIAN TO GET THE CERTIFICATION FOM THE ENGINEER OF RECORD PRIOR TO APPROVING THE FINAL GRADING FOR THIS SITE.}
09/16/2019 COT - ENGR - Signage Final Passed {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
09/20/2019 ENGR Grading Final Passed {Activity date: 09/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/16/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
09/23/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Stabilize all ground disturbed by construction of this site. Terminate the SWPPP. Provide a readable copy of the letter provide it.} ; {Activity date: 09/16/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Provide stabilization for all disturbed soil on site And areas around site that was disturbed during construction.}
09/23/2019 ENGR Engineering Final Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Stabilize all ground disturbed by construction of this site. Terminate the SWPPP. Provide a readable copy of the letter provide it.} ; {Activity date: 09/16/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - read notes from engineering final.}
09/23/2019 SITE - Stormwater Final Inspection Passed {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/16/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete notes from past inspection.}