Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/23/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by VFLORES1 - |
| 09/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Stabilize all ground disturbed by construction of this site. Terminate the SWPPP. Provide a readable copy of the letter provide it. |
| 09/16/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Complete all work on site plans. Complete all notes from past inspections |
| 09/23/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by VFLORES1 - |
| 09/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Stabilize all ground disturbed by construction of this site. Terminate the SWPPP. Provide a readable copy of the letter provide it. |
| 09/16/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - read notes from engineering final. |