Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2019 |
PDSD Site/Engineering Division - Landscaping |
RLEDONNE |
Approved |
Entered by DMERANZ1 - |
| 09/23/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by VFLORES1 - |
| 09/20/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Stabilize all ground disturbed by construction of this site. Terminate the SWPPP. Provide a readable copy of the letter provide it. |
| 09/16/2019 |
PDSD Site/Engineering Division - Landscaping |
RLEDONNE |
Not ready for Inspection |