Permit: DP18-0131
Permit Details
Apply Date:
06/01/2018
Applicant:
Description:
SITE/GRADING - AZDPS HANGER
Permit Reviews
Permit Number - DP18-0131
Permit Status: Complete
Permit Description: SITE/GRADING - AZDPS HANGER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/01/2018 | DEV PKG - OK TO SUBMIT | 06/01/2018 | COMPLETED |
06/01/2018 | SITE and/or GRADING | 07/02/2018 | COMPLETED |
08/14/2018 | SITE and/or GRADING | 10/08/2018 | COMPLETED |
Conditions
Permit Number - DP18-0131
Permit Status: Complete
Permit Description: SITE/GRADING - AZDPS HANGER
Date | Description | Comments |
---|---|---|
09/19/2019 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
09/19/2019 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0131
Permit Description: SITE/GRADING - AZDPS HANGER
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/02/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
09/16/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
09/16/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, MINOR TRACKOUT NOTED ON THE ONSITE PAVEMENT.} | |
09/16/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - RIP RAP AND DRAINAGE WAYS HAVE BEEN INSTALLED PRIOR TO THIS SITE VISIT. I WILL ASK BRIAN TO GET THE CERTIFICATION FOM THE ENGINEER OF RECORD PRIOR TO APPROVING THE FINAL GRADING FOR THIS SITE.} | |
09/16/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 09/16/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
09/20/2019 | ENGR Grading Final | Passed | {Activity date: 09/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/16/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
09/23/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Stabilize all ground disturbed by construction of this site. Terminate the SWPPP. Provide a readable copy of the letter provide it.} ; {Activity date: 09/16/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Provide stabilization for all disturbed soil on site And areas around site that was disturbed during construction.} | |
09/23/2019 | ENGR Engineering Final | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Stabilize all ground disturbed by construction of this site. Terminate the SWPPP. Provide a readable copy of the letter provide it.} ; {Activity date: 09/16/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - read notes from engineering final.} | |
09/23/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 09/16/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete notes from past inspection.} |