Permit: DP18-0088
Permit Details
Apply Date:
04/16/2018
Applicant:
Mike Culbert
Description:
SITE/GRADING/SWPP - TEP Irvington Campus, Field Operations Center and Truck Depot.
Permit Reviews
Permit Number - DP18-0088
Permit Status: Complete
Permit Description: SITE/GRADING/SWPP - TEP Irvington Campus, Field Operations Center and Truck Depot.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/27/2019 | REVISION - - 2ND | 05/08/2019 | COMPLETED |
04/16/2018 | DEV PKG - OK TO SUBMIT | 04/16/2018 | COMPLETED |
04/16/2018 | DEV PKG | 06/06/2018 | COMPLETED |
05/12/2021 | DEV PKG - OK TO SUBMIT | 05/19/2021 | COMPLETED |
05/19/2021 | DEV PKG - REVISION | 06/30/2021 | COMPLETED |
06/06/2018 | DEV PKG - RESUBMITTAL | 07/17/2018 | COMPLETED |
09/10/2018 | REVISION - - 1ST | 09/10/2018 | COMPLETED |
09/25/2019 | DEV PKG - OK TO SUBMIT | 10/29/2019 | COMPLETED |
10/29/2019 | REVISION - - 3RD | 12/09/2019 | COMPLETED |
11/15/2019 | DEV PKG - OK TO SUBMIT | 12/17/2019 | COMPLETED |
12/17/2019 | DEV PKG - REVISION | 01/03/2020 | COMPLETED |
12/22/2021 | DEV PKG - OK TO SUBMIT | 12/27/2021 | COMPLETED |
12/27/2021 | DEV PKG - REVISION | 03/31/2022 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0088
Permit Description: SITE/GRADING/SWPP - TEP Irvington Campus, Field Operations Center and Truck Depot.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/09/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
08/16/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/16/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
08/20/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/20/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } | |
08/20/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/20/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } | |
08/20/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 08/20/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} | |
11/18/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No changes from last inspection.} ; {Activity date: 10/29/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No changes from last inspection.} ; {Activity date: 10/21/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No changes from last inspection.} ; {Activity date: 09/30/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No changes from last inspection.} ; {Activity date: 09/17/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No changes from last inspection.} ; {Activity date: 09/11/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No change from last inspection refer to notes from last inspection. } ; {Activity date: 09/09/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. Silt Continues to build and more erosion from last inspection.} ; {Activity date: 08/04/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No changes from last inspection.} ; {Activity date: 07/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. Silt building up in riprap at Inlets and outlets of pipe.} ; {Activity date: 04/02/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - No concerns at this time.} ; {Activity date: 03/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 02/21/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - no concerns at this time} ; {Activity date: 12/17/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 12/03/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Talk to Rex on the phone about making repairs to temporary controls. } ; {Activity date: 11/19/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 11/05/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 10/08/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with the general contractor on site about track out on Irvington needs to be cleaned up. Waddle needs to be repaired at Culver high Northeast side of site.} ; {Activity date: 09/24/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 05/07/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - No track out on Irvington Road at this time} ; {Activity date: 03/27/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - No concerns at this time} ; {Activity date: 03/13/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Controls in place south of culvert. Talked to racks from Ashton about track out on Irvington needs to add track out rock at entrance and clean Irvington at end of each day} ; {Activity date: 03/06/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT ON IRVINGTON AT THIS TIME.} ; {Activity date: 02/27/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - No concerns at this time.} ; {Activity date: 02/07/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Jobsite very muddy due to rain activity. No concerns at this time} ; {Activity date: 01/24/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Waddle has been replaced at south end of culvert.} ; {Activity date: 01/10/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Add new waddle south of culvert met with Rex on site.} ; {Activity date: 12/27/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - no concerns at this time.} ; {Activity date: 12/13/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Install of RCP storm water piping and manhole highlights on a proof plan 36-inch pipe.} ; {Activity date: 11/29/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - No concerns at this time.} ; {Activity date: 11/19/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH REX ON SITE NO CONCERNS AT THIS TIME.} ; {Activity date: 10/29/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH NICK ABOUT ADDING WADDEL .} ; {Activity date: 10/19/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH NICK ON SITE ABOUT ADDING WADDIE ON EAST SIDE OF THE NINE HDPE PIPES.} ; {Activity date: 09/27/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON IRVINGTON.} ; {Activity date: 09/13/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/30/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/16/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH REX ABOUT SMALL REPAIRS TO SWPPP CONTOLS.} ; {Activity date: 08/09/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH WENT OVER PLANS.} |
|
11/18/2021 | ENGR Grading Final | Passed | {Activity date: 11/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
11/18/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/20/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Provide certification letter for all grading and drainage by engineer of record. Provide revisions for all changes to approve plans COT approved. Remove all sediment at inlet where The sediment has built up. } ; {Activity date: 04/16/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Complete all work on approved plans for basins or provide revisions for all changes to basins. 09170 drainage basin inspection. Fair. Basin still under construction has not been approved. 09190 final grading. Complete all work on approved plans provide revisions for all changes to approve plans/as built.Provide certification letter from engineer of record for all grading and drainage per approved plans. Before final grading.} |
|
04/20/2022 | ENGR Engineering Final | Passed | {Activity date: 04/20/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - Approved } ; {Activity date: 04/01/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TALKED WITH MIKE CULBERT, AIA WITH SWAIMM ASSOCIATES AND ARCHITECTS ABOUT THE REMAINING ISSUES THAT HAVE BEEN LEFT WITH THIS OPEN PERMIT. THEY ARE WORKING ON REVISING ANY DRAWINGS AS NEEDED AND REWORKING THE ON SITE BASINS AND DRAINAGE WAYS BACK TO THE ORIGINAL ELEVATIONS AS NOTED ON THE APPROVED DRAWINGS. OVER THE PAST FEW YEARS ADDITIONAL SEDIMENT HAS BEEN NOTED WITHIN THESE AREAS BUT HAS NOT BEEN REMOVED AT THIS TIME. ONCE THIS WORK IS COMPLETED THE PERMIT WILL BE ALLOWED TO BE CLOSED AND PLACED INTO FINAL STATUS.} ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MIKE CULBERT IS WORKING ON PROVIDING ALL OF THE REMAINING DOCUMENTATION} ; {Activity date: 05/20/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Complete all the notes from stormwater final inspection on this date. } |