Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0088
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/20/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
08/20/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
01/14/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Rebar for headwall per highlights on page c o 5 |
09/26/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by CMURPHY1 - Headwall at west end of nine 36" HDPE SD piping rebar ok. |
11/18/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
11/18/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - 9185 (GRADING - INTERMEDIATE) MET WITH MIKE CULBERT FROM TEP AND MEMBERS OF DIVERSIFIED AND DESIGN AND WALKED PORTIONS OF THE SITE TO VERIFY WHAT ITEMS WERE STILL NEEDED TO CLEAR THE PREVIOUS PERMITS. MIKE WILL GET BACK WITH ME LATER NEXT WEEK WITH THE LASTIF THE INFORMATION AND COORDINATING PERMIT NUMBERS SO WE CAN FINALLY CLOSE OUT THESE PERMITS. WHAT I HAVE ASKED THEM TO ACKNOWLEDGE IS ALL PHYSICAL BARRIERS (ELECTRICAL PEDESTALS, ICE MAKERS, AND PALLETS OF MATERIALS) WITHIN THE 4 FOOT PEDESTRIAN PATHWAYS AROUND THE BUILDINGS ON THE DP PLANS FOR THIS SITE AS NEEDED. |
08/06/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - PARTIAL AT THIS TIME. I WALKED THE SITE WITH REPRESENTATIVES FROM ASHTON CORP, AND DIVERSIFIED II TO SEE WHAT IS REMAINING ON THIS SITE THAT NEEDS TO BE COMPLETED PRIOR TO THE FINAL CLOSURE. THE LUST IS AS FOLLOWS 1) PROVIDE REVISED APPROVED DRAWINGS FOR THIS SITE THAT CONTAIN ALL CHANGES THAT HAVE BEEN MADE. 2) PROVIDE A NOTIFICATION OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THIS SITE. 3)REPAIR ALL EROSIN DAMAGED IN THE DRAINAGE CHANNEL LOCATED ON THE EAST SIDE OF THIS PROPERTY. REMOVE ALL ADDITIONAL MATERIAL FROM THE CHANNEL BOTTOM AND RETURN THE ELEVATIONS AS NOTED BY THE ELEVATION BEAM IN THE BOTTOM OF THE CHANNEL. 4) REPAIR EROSION NOTED IN THE BASIN EAST OF BUILDING 1 AND REMOVE ALL ACCESS MATERIAL, SILT, AND SEDIMENT FROM WITHIN THE BASIN. 5) BUILDINGS 1 - 3 HAVE ROOF DRAINAGE THAT IS DEPOSITED DIRECTLY ONTO SIDEWALKS OR PEDESTRIAN ACCESS AREAS AROUND THE BUILDINGS. HAVE THE ENGINEER OF RECORD VERIFY THAT THIS IS ACCEPTABLE SINCE PORTIONS OF THIS IS AGAINST OUR CITY CODES AND STANDARDS. CONSULT THE CITY OF TUCSON ENGINEERING AND ZONING REVIEWERS TO VERIFY THAT WHAT IS AGREED UPON MEET CURRENT CODE. 6) REMOVE ALL STORED MATERIAL, PALLETS, AND ICE MACHINES FROM THE PEDESTRIAN ACCESS AREAS AS THEY ARE REQUIRED DURING THE CONVERSATIONS HAPPENING WITH NOTE #5. |
04/13/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - |
11/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by PAHUMAD1 - Continued. Continue. No changes to site no grading activity at this time. |
08/19/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. For grading final provide certification letter from engineer of record for all grading and drainage has been installed per approved plan. Clean all settlement trash and weeds from retention detention basin and drainageways. Provide additional rock to illuminate erosion and sediment buildup. |
12/06/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Working on rock riprap in basin south of building three. Striping has not started at this time. |
10/28/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Sidewalks on northside and east side of building one checked for slopes all under 2%. Walked with foreman from hard rock. |
09/24/2019 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Inspection canceled due to rain. |
12/27/2018 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Continuation of RCP into new basin. 6 in of slurry installed above already installed piping, backfilling over completed sections. Nick with Ashton Construction. |
09/24/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH BRIAN. |
09/21/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - SD PER HIGH LIGHTS ON PAGE C05. |
09/20/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - SD PIPING PER HIGH LIGHTS ON AP PLANS ON PAGE CO4. |
09/19/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PER HIGH LIGHTS ON PAGE C04 FOR 36'' HDPE SD PIPING. |
09/13/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PER HIGHTS ON PAGES C04 & C08 FOR SD PIPING. |
09/05/2018 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by RLEDONN1 - PER HIGH LIGHTS ON PAGE C22 FOR STORM DRAIN PIPING. |
11/18/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |