Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP18-0088
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2021 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - |
11/10/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. No changes from last inspection. |
10/29/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No changes from last inspection. |
10/21/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No changes from last inspection. |
09/30/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No changes from last inspection. |
09/17/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No changes from last inspection. |
09/11/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No change from last inspection refer to notes from last inspection. |
09/09/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Silt Continues to build and more erosion from last inspection. |
08/04/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No changes from last inspection. |
07/13/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Silt building up in riprap at Inlets and outlets of pipe. |
04/02/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by SFLORES2 - No concerns at this time. |
03/05/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. |
02/21/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - no concerns at this time |
12/17/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. |
12/03/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - Talk to Rex on the phone about making repairs to temporary controls. |
11/19/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. |
11/05/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. |
10/08/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - Met with the general contractor on site about track out on Irvington needs to be cleaned up. Waddle needs to be repaired at Culver high Northeast side of site. |
09/24/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. |
05/07/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - No track out on Irvington Road at this time |
03/27/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - No concerns at this time |
03/13/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Controls in place south of culvert. Talked to racks from Ashton about track out on Irvington needs to add track out rock at entrance and clean Irvington at end of each day |
03/06/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT ON IRVINGTON AT THIS TIME. |
02/27/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - No concerns at this time. |
02/07/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Jobsite very muddy due to rain activity. No concerns at this time |
01/24/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Waddle has been replaced at south end of culvert. |
01/10/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Add new waddle south of culvert met with Rex on site. |
12/27/2018 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - no concerns at this time. |
12/13/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - Install of RCP storm water piping and manhole highlights on a proof plan 36-inch pipe. |
11/29/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CBELL1 - No concerns at this time. |
11/19/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH REX ON SITE NO CONCERNS AT THIS TIME. |
10/29/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH NICK ABOUT ADDING WADDEL . |
10/19/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH NICK ON SITE ABOUT ADDING WADDIE ON EAST SIDE OF THE NINE HDPE PIPES. |
09/27/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
09/20/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON IRVINGTON. |
09/13/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
08/30/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
08/16/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH REX ABOUT SMALL REPAIRS TO SWPPP CONTOLS. |
08/09/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH WENT OVER PLANS. |