Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
03/15/2018
Applicant:
Lisa Bowers
Description:
E SITE/GRADING/SWPPP/PAD/IID - THE TRINITY MIXED USE

Permit Reviews

Permit Number - DP18-0058
Permit Status: Issued
Permit Description: E SITE/GRADING/SWPPP/PAD/IID - THE TRINITY MIXED USE
Start Date Submittal Complete Date Status  
03/15/2018 DEV PKG - OK TO SUBMIT 03/20/2018 COMPLETED Review Details
03/16/2018 DEV PKG 04/27/2018 COMPLETED Review Details
07/30/2018 DEV PKG - RESUBMITTAL 08/29/2018 COMPLETED Review Details
09/05/2018 DEV PKG - RESUBMITTAL 10/11/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP18-0058
Permit Status: Issued
Permit Description: E SITE/GRADING/SWPPP/PAD/IID - THE TRINITY MIXED USE
Total Outstanding Activity Conditions - 4
Date Name
10/01/2018 Applicant is working with Real Estate on the sale of a 127sf spandrel at the SWC of the project and aerial easements for encroachments over 4th Ave and 4th St. The deed and easement sales should be completed as a condition of the CoO.Jim StoyanoffReal Estate Consultant
10/05/2018
10/05/2018
10/05/2018

Outstanding Inspections

Permit Status: Issued
Permit Number: DP18-0058
Permite Description: E SITE/GRADING/SWPPP/PAD/IID - THE TRINITY MIXED USE
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP18-0058
Permit Description: E SITE/GRADING/SWPPP/PAD/IID - THE TRINITY MIXED USE
Total Completed Inspections - 5
Date Description Inspector Results Comments
11/13/2019 SITE - Stormwater Follow-up Passed {Activity date: 11/13/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
11/13/2019 SITE - Stormwater Final Inspection Passed {Activity date: 11/13/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
11/13/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 11/13/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
11/15/2019 COT - ENGR - Signage Final Passed {Activity date: 11/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
11/26/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/26/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/19/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - This is a two-phase project. TOEFL Dent Construction super Don 989-1618. Main entrance is off of 3rd Avenue. Schedule for inspection of your stormwater controls, then follow up every other week with stormwater inspection. Use grating rebar inspection for your trash enclosures.}

Documents

File Name Document Type  
1-22 OF 22.PDF DEVELOPMENT PACKAGE VIEW
SIGNED PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
TDC LTR TO COT RE PERMITS 15NOV18.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
010571_000649.PDF DOCUMENTS VIEW
1_DP18-0058_ADDRESSING.PDF DOCUMENTS VIEW
PAGES FROM TRINITY PLANS.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT_2018-02-28.PDF DOCUMENTS VIEW
GEOTECH_REPORT.PDF DOCUMENTS VIEW
SWPPP_2018-03-09.PDF DOCUMENTS VIEW
2ND_FLOOR_PLAN.PDF DOCUMENTS VIEW
3RD_FLOOR_PLAN.PDF DOCUMENTS VIEW
4TH_FLOOR_PLAN.PDF DOCUMENTS VIEW
CIVIL_COMMENT_RESPONSE.PDF DOCUMENTS VIEW
LANDSCAPE_COMMENT_RESPONSE.PDF DOCUMENTS VIEW
LANDSCAPE_COMMENT_RESPONSE_TDOT.PDF DOCUMENTS VIEW
COMMENT_RESPONSE.PDF DOCUMENTS VIEW