Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP18-0058
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
11/27/2019 | ENGR Engineering Final | DROBERT5 | Not ready for Inspection | Entered by DROBERT5 - THIS INSPECTION IS BEING APPROVED AT THIS TIME WITH THE INTENT THAT THE NON-COMPLIANT ACCESS FROM THIS SITE WILL BE COMPLETED AND MADE COMPLIANT DURING THE PHASE 2 PORTION OF THE SITE ON DP18-0058. IF THERE ARE ANY QUESTIONS ABOUT THIS SITE YOU CAN CONTACT ME AT (520) 349-7643. |
11/27/2019 | ENGR Engineering Final | DROBERT5 | Not ready for Inspection | Entered by DROBERT5 - THIS INSPECTION IS BEING APPROVED AT THIS TIME WITH THE INTENT THAT THE NON-COMPLIANT ACCESS FROM THIS SITE WILL BE COMPLETED AND MADE COMPLIANT DURING THE PHASE 2 PORTION OF THE SITE ON DP18-0058. IF THERE ARE ANY QUESTIONS ABOUT THIS SITE YOU CAN CONTACT ME AT (520) 349-7643. |
10/04/2019 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy. Don with TOEFL dent construction. Call for and have approved all required inspections for this permit. Correct the slope of the accessible parking space. Complete all the work shown on your development package permit for this phase. Pay attention to any water Harvesting specifications on your plan. |