Permit: DP18-0058

Parcel: 11703321G


Addresses:

400 E UNIVERSITY BL


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP18-0058

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
11/26/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by DMERANZ1 -
11/19/2018 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CBELL1 - This is a two-phase project. TOEFL Dent Construction super Don 989-1618. Main entrance is off of 3rd Avenue. Schedule for inspection of your stormwater controls, then follow up every other week with stormwater inspection. Use grating rebar inspection for your trash enclosures.