Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/26/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 11/19/2018 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by CBELL1 - This is a two-phase project. TOEFL Dent Construction super Don 989-1618. Main entrance is off of 3rd Avenue. Schedule for inspection of your stormwater controls, then follow up every other week with stormwater inspection. Use grating rebar inspection for your trash enclosures. |