Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP18-0058
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/26/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by DMERANZ1 - |
11/19/2018 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by CBELL1 - This is a two-phase project. TOEFL Dent Construction super Don 989-1618. Main entrance is off of 3rd Avenue. Schedule for inspection of your stormwater controls, then follow up every other week with stormwater inspection. Use grating rebar inspection for your trash enclosures. |