Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3749 S MISSION RD
Apply Date:
01/05/2018
Applicant:
Marty Magelli
Description:
SITE/GRADING - JACK IN THE BOX

Permit Reviews

Permit Number - DP18-0004
Permit Status: Complete
Permit Description: SITE/GRADING - JACK IN THE BOX
Start Date Submittal Complete Date Status  
01/05/2018 DEV PKG - OK TO SUBMIT 01/05/2018 COMPLETED Review Details
01/05/2018 DEV PKG 02/16/2018 COMPLETED Review Details
03/22/2018 DEV PKG - RESUBMITTAL 04/18/2018 COMPLETED Review Details
04/18/2018 DEV PKG - RESUBMITTAL 05/03/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0004
Permit Description: SITE/GRADING - JACK IN THE BOX
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/15/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/15/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
09/14/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 09/14/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
10/11/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/11/2018 SITE - Stormwater Follow-up Passed {Activity date: 10/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/25/2018; Status: Correction Required; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - There are no concerns at this time, the site is well contained.

Thank you Brian} ; {Activity date: 09/14/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - No concerns} ; {Activity date: 07/03/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, ALL WORK IS CONTAINED WITHIN THE COMPOUND}
10/11/2018 ENGR Grading Final Passed {Activity date: 10/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/11/2018 COT - ENGR - Signage Final Passed {Activity date: 10/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/18/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/18/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 10/11/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL LANDSCAPING ITEMS AS SHOWN ON THE APPROVED DRAWINGS FOR THIS SITE.} ; {Activity date: 09/14/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
10/18/2018 SITE - Stormwater Final Inspection Passed {Activity date: 10/18/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 10/11/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY AT THIS TIME, PROVIDE APPROVED REVISED DRAWINGS FOR ANY CHANGES THAT HAVE BEEN MADE TO THIS SITE, A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE WHEN THE FINAL INSPECTIONS OF THIS PERMIT ALL SCHEDULED.}
10/25/2018 ENGR Engineering Final Passed {Activity date: 10/25/2018; Status: Approved; Inspector: JV; Comment: Entered by JVWINKL1 - } ; {Activity date: 10/18/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Superintendent Pete} ; {Activity date: 10/17/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - There was no sip required for this job.
09190, grading final, not ready. See the notes from 10:11 requiring a certification letter.} ; {Activity date: 10/11/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY AT THIS TIME, PROVIDE APPROVED REVISED DRAWINGS FOR ANY CHANGES THAT HAVE BEEN MADE TO THIS SITE, A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE WHEN THE FINAL INSPECTIONS OF THIS PERMIT ALL SCHEDULED.} ; {Activity date: 09/14/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }