Permit: DP18-0004

Parcel: 119215960


Addresses:

3749 S MISSION RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0004

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/14/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 - OK TO PLACE THE GROUT INTO THE TRASH ENCLOSURE WALLS AT THS TIME.
08/07/2018 ENGR Grading Final BBENEDON Approved Entered by DROBERT5 - MET WITH THE CREW ON SITE, THEY HAVE COMPLETED THE INSTALLATION OF THE REBAR AT THIS TIME, THIS AREA IS APPROVED FOR THE PLACEMENT OF THE CONCRETE FOR THE FOOTERS.
08/06/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DROBERT5 - THE CONTRACTOR IS NOT READY AT THIS TIME AND WILL RESCHEDULE FOR THIS INSPECTION AT A LATER DATE
07/03/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR ASKED IF THEY COULD REMOVE THE APPROACH SLABS AS SHOWN ON THE APPROVED PLANS. I ADVISED THEM THAT WE DO NOT ACCEPT THE USE OF ASPHALTIC CONCRETE IN THE 10 x 10 APPROACH APRON, THEY WILL NEED TO POUR THE CONCRETE.
10/11/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/11/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/14/2018 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 -
10/11/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/25/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CMURPHY1 - Grading in progress for pedestrian access route from Mission. Reviewed plans with Scott, a 5-inch grade change is acceptable.
09/14/2018 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - Detectable Warning device indicated on Detail
08/30/2018 ENGR Grading Final BBENEDON Partial Approval Entered by CMURPHY1 - Installing curbs, suggest maintaining 6-inch reveal.
08/30/2018 ENGR Grading Final BBENEDO1 Partial Approval Entered by BBENEDO1 - IVRS - Inspection :*
08/14/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREW IS WORK ON THE COMPLETION OF THE TRASH ENCLOSURE WALLS AND WILL BE PREPARING FOR THE PLACEMENT OF THE GROUT IN THE NEXT FEW DAYS. THEY HAVE PLACED THE KNOCJOUTS AT THE BOTTOMS OF THE WALLS ON MOST OF THE WALLS, OTHER HOLES WILL BE COMPLETED ON 8/15/18
07/03/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR IS WORKING ON THE CONSTRUCTION OF THE STRUCTURE, NO OTER WORK ON SITE AT THIS TIME. THEY DID ASK ABOUT THE CONSTRUCTION OF THE TRASH ENCLOSURES THAT WILL BE HAPPENING IN THE NEAR FUTURE.
06/26/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - NO9 ONE ON SITE AT 4:50 TO ALLOW ME ACCESS INTO THIS SITE.
06/21/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - NO ONE ON SITE AT 2:35 FOR THIS INSPECTION, THIS WILL NEED TO BE RESCHEDULED AT A LATER DATE