Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/11/2018 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/25/2018 |
ENGR Engineering Final
|
JV |
Approved |
Entered by JVWINKL1 - |
| 10/18/2018 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Superintendent Pete |
| 10/17/2018 |
ENGR Engineering Final
|
bbenedo1 |
Not ready for Inspection |
Entered by BBENEDO1 - There was no sip required for this job.
09190, grading final, not ready. See the notes from 10:11 requiring a certification letter. |
| 10/11/2018 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - NOT READY AT THIS TIME, PROVIDE APPROVED REVISED DRAWINGS FOR ANY CHANGES THAT HAVE BEEN MADE TO THIS SITE, A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE WHEN THE FINAL INSPECTIONS OF THIS PERMIT ALL SCHEDULED. |
| 09/14/2018 |
ENGR Engineering Final
|
bbenedo1 |
Not ready for Inspection |
Entered by BBENEDO1 - |