Permit: DP17-0290
Permit Details
Apply Date:
12/08/2017
Applicant:
Tri Miller
Description:
SITE/GRADING - SUBARU1st revision approved 6/14/18 (sheet 1, 3, 4, 5)
Permit Reviews
Permit Number - DP17-0290
Permit Status: Complete
Permit Description: SITE/GRADING - SUBARU1st revision approved 6/14/18 (sheet 1, 3, 4, 5)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/02/2018 | DEV PKG - RESUBMITTAL | 04/25/2018 | COMPLETED |
04/25/2018 | DEV PKG - RESUBMITTAL | 05/21/2018 | COMPLETED |
06/08/2018 | DEV PKG - REVISION | 06/18/2018 | COMPLETED |
12/08/2017 | DEV PKG - OK TO SUBMIT | 12/08/2017 | COMPLETED |
12/08/2017 | DEV PKG | 03/02/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0290
Permit Description: SITE/GRADING - SUBARU1st revision approved 6/14/18 (sheet 1, 3, 4, 5)
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
11/21/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 11/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
11/21/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
11/21/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
11/21/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
11/21/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
11/21/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 11/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
03/11/2020 | ENGR Engineering Final | Passed | {Activity date: 03/11/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/21/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide a letter from the engineer certifying that the work installed without inspection was installed per plan and that the site grading is also as shown on city approved plans.} | |
03/11/2020 | ENGR Grading Final | Passed | {Activity date: 03/11/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/09/2019; Status: Not Applicable; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NOT APPLICABLE FOR THE REQUEST FOR LIGHT POLE FOUNDATION, THIS INSPECTION IS TO BE DONE BY DAN QUINN OF THE BUILDING INSPECTORS.} |