Permit: DP17-0289
Permit Details
Status:
Expired
Type:
Development Package
Address:
1400 E AERO PARK BL
Address NEW:
1400 E AERO PARK BL
Apply Date:
12/07/2017
Applicant:
Description:
SITE/GRADING/SWPPP - TEP/RAYTHEON AERO PARK SUBSTATION
Outstanding Inspections
Permit Status: Expired
Permit Number: DP17-0289
Permite Description: SITE/GRADING/SWPPP - TEP/RAYTHEON AERO PARK SUBSTATION
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2018 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 07/06/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE SITE AND HAVE REMINDED THE CREW TO CONTINUE TO MONITOR THE SITE FOR MODIFICATIONS AND REPAIRS.} ; {Activity date: 06/14/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE INSTALLATION OF THE TRACKOUT MATERIAL AT THE 2 ENTRANCES. HAVE THE ENGINEER OF RECORD PROVIDE THE SITE WITH A DETAIL FOR THE TRACKOUT MATERIAL. THE PLANS CURRENTLY INDICATE THAT THE TRACK OUT IS THE SAME AREA AS THE FUTURE AC PAVEMENT.} |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Follow-up | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
| 10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready |
Completed Inspections
Permit Status: Expired
Permit Number: DP17-0289
Permit Description: SITE/GRADING/SWPPP - TEP/RAYTHEON AERO PARK SUBSTATION
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 11/15/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 11/15/2023 | SITE - Stormwater Follow-up | Passed | ||
| 11/15/2023 | ENGR Grading Final | Passed | ||
| 11/15/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 11/15/2023 | COT - ENGR - Signage Final | Passed |