Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 06/04/2018 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - THE PRECON WAS HELD WITH TEP AND THE CONTRACTORS TO DISCUSS WHAT IS EXPECTED OF THIS SITE DURING CONSTRUCTION. I HAVE ADVISED THEM TO CALL IN AND SCHEDULE BI-WEEKLY STORMWATER INSPECTIONS AS LON G AS THE SITE IS MOVING DIRT. THIS WORK WILL EITHER START LATER THIS WEEK ONCE THEY OBTAIN A WATER PERMIT. THE SITE WILL BE INSPECTED AGAIN ONCE THE SWPPP CONTROLS HAVE BEEN COMPLETED |
| 11/15/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
|