Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP17-0289
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
05/11/2021 | ENGR Grading Final | MHERNANDEZ | Cancelled | Entered by VLEON1 - CANNOT FIND THE ADDRESS |
09/18/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THERE ARE NO CONCERNS ON THIS SITE AT THIS TIME. TEP IS WORKING WITHIN THE WALLS INSTALLING ALLL OF THE STRUCTURES AND THE DIRT CONTRACTOR IS WORKING OUTSIDE THE AREA MOSTLY. |
09/18/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKED OVER THE SIDEWALK THAT HAS BEEN FORMED ON THE WEST SIDE OF THE EAST ENTRANCE. THERE ARE A FEW AREAS WHER THE CONTRACTOR NEEDS TO MAKE MINOR MODIFICATIONS TO THE FORMS PRIOR TO POURING THE CONCRETE FOR THIS SIDE. THE EAST SIDE OF THE EAST ENTRANCE IS ABLE TO BE POURED AT THIS TIME, IT WILL NEED TO BE REWORKED AND RECHECKED PRIOR TO THE PLACEMENT OF THE CONCRETE. I HAVE ASKED THE CONTRACTOR TO FORWARD ME PICTURES OF THE WORK ONCE IT HAS BEEN REPAIRED FOR TODAYS POUR, AND TO RESCHEDULE THE EAST SIDE OF THE EAST ENTRANCE FOR A LATER DATE WHEN THE WORK IS COMPLETE. |
07/20/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CONTRACTOR CONTINUES TO WORK ON THE SITE WALLS AND PEDESTALS. I LOOKED AT THE PREGROUT FOR THE EASTERN WALL AND THE EASTER HALF OF THE SOUTHERN WALL FOR THE FIRST 4 FEET |
06/29/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - TRENCHING FOR THE ELECTRICAL GROUND WIRES FORMING FOR FOUNDATIONS DRILLING FOR FOOTERS |
06/14/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS ARE WORKING ON THE PREPARATION OF THE SUBGRADE FOR THIS SITE, IT IS ANTICIPATED TO TAKE 2 WEEKS TO COMPLETE. |
11/15/2023 | ENGR Grading Final | Passed | ||
11/15/2023 | ENGR Grading Final | Passed | ||
11/15/2023 | ENGR Grading Final | Passed | ||
11/15/2023 | ENGR Grading Final | Passed |