Permit: DP17-0273
Permit Details
Apply Date:
11/20/2017
Applicant:
Description:
SITE/GRADING/SWPPP - MIDVALE GOODWILL STOREOriginal approval 2/21/2018 (13 sheets)1st Revi
Permit Reviews
Permit Number - DP17-0273
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - MIDVALE GOODWILL STOREOriginal approval 2/21/2018 (13 sheets)1st Revi
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/12/2018 | DEV PKG - RESUBMITTAL | 02/13/2018 | COMPLETED |
02/13/2018 | DEV PKG - RESUBMITTAL | 06/18/2018 | COMPLETED |
07/06/2018 | DEV PKG - REVISION | 07/18/2018 | COMPLETED |
11/20/2017 | DEV PKG - OK TO SUBMIT | 11/20/2017 | COMPLETED |
11/20/2017 | DEV PKG | 01/12/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0273
Permit Description: SITE/GRADING/SWPPP - MIDVALE GOODWILL STOREOriginal approval 2/21/2018 (13 sheets)1st Revi
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/01/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/01/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/07/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/07/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT SMALL REPAIRS.} ; {Activity date: 03/01/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
07/10/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/10/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/10/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 07/10/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/26/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/26/2018 | ENGR Engineering Final | Passed | {Activity date: 07/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/24/2018; Status: Partial Approval; Inspector: BBENADON; Comment: Entered by DROBERT5 - 1) PROVIDE THE CITY A COPY OF THE NOTIFICATION OF TERMINATION FROM THE STATE FOR THE ACTIVE STORMWATER PERMIT. 2) INSTALL THE PARKING BLOCKS IN ALL THE HANDCAP PARKIN SPACES AS SHOWN ON THE APPROVED PLANS} |
|
07/26/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH ROB AND LOOKED OVER THE SITE TO SEE WHAT IS HAPPENING AT THIS TIME. I HAVE ADVISED HIM THAT HE NEEDS TO LOOK AT THE ROCK RIP RAP PLACEMENT WITHIN THE BASIN TO ENSURE THAT IT IS COMPLETED PER THE APPROVED PLANS, SOME OF THE AREAS ARE NOT TO THE PROPER THICKNESS.} ; {Activity date: 06/08/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WAS CONTACTED BY ROB AND WILL BE PUSHING THIS INSPECTION TILL MONDAY MORNING NEXT WEEK WHEN WE WILL HAVE THE TIME TO WALK THE SITE AND SEE WHAT NEEDS TO BE DONE.} ; {Activity date: 04/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERN.} | |
07/26/2018 | ENGR Grading Final | Passed | {Activity date: 07/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/26/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |