Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP17-0273
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/2018 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - |
06/11/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - MET WITH ROB AND LOOKED OVER THE SITE TO SEE WHAT IS HAPPENING AT THIS TIME. I HAVE ADVISED HIM THAT HE NEEDS TO LOOK AT THE ROCK RIP RAP PLACEMENT WITHIN THE BASIN TO ENSURE THAT IT IS COMPLETED PER THE APPROVED PLANS, SOME OF THE AREAS ARE NOT TO THE PROPER THICKNESS. |
06/08/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - WAS CONTACTED BY ROB AND WILL BE PUSHING THIS INSPECTION TILL MONDAY MORNING NEXT WEEK WHEN WE WILL HAVE THE TIME TO WALK THE SITE AND SEE WHAT NEEDS TO BE DONE. |
04/17/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERN. |