Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP17-0273
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/26/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/26/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
06/18/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKED AT THE REBAR FOR THE TRASH ENCLOSURE SLAB, THE CREW IS STILL INSTALLING IT AND WILL HAVE IT COMPLETED BY THIS AFTERNOON. THE CREW SENT ME PHOTOS SHOWING THE COMPLETED MAT, THEY ARE OK TO POUR THE SLAB AT THIS TIME. |
06/14/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE TRASH ENCLOSURE HAS BEEN APPROVED FOR GROUT |
06/11/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET WITH ROB AND LOOKED OVER THE SITE TO SEE WHAT IS HAPPENING AT THIS TIME. I HAVE ADVISED HIM THAT HE NEEDS TO LOOK AT THE ROCK RIP RAP PLACEMENT WITHIN THE BASIN TO ENSURE THAT IT IS COMPLETED PER THE APPROVED PLANS, SOME OF THE AREAS ARE NOT TO THE PROPER THICKNESS. |
06/08/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - WAS CONTACTED BY ROB AND WILL BE PUSHING THIS INSPECTION TILL MONDAY MORNING NEXT WEEK WHEN WE WILL HAVE THE TIME TO WALK THE SITE AND SEE WHAT NEEDS TO BE DONE. |
07/26/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/10/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS WORKING ON THE COMPLETION OF THE PAVEMENT IN THE FRON PARKING AREA AND THE FILL ON THE NORTHSIDE OF THE BUILDING. I HAVE ASKED THE CONTRACTOR TO CALL IN THE INSPECTIONS THAT ARE STILL OPEN SO THAT WE CAN START CLOSING THIS SITE OUT. |
06/11/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET WITH ROB AND LOOKED OVER THE SITE TO SEE WHAT IS HAPPENING AT THIS TIME. I HAVE ADVISED HIM THAT HE NEEDS TO LOOK AT THE ROCK RIP RAP PLACEMENT WITHIN THE BASIN TO ENSURE THAT IT IS COMPLETED PER THE APPROVED PLANS, SOME OF THE AREAS ARE NOT TO THE PROPER THICKNESS. |
06/08/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - WAS CONTACTED BY ROB AND WILL BE PUSHING THIS INSPECTION TILL MONDAY MORNING NEXT WEEK WHEN WE WILL HAVE THE TIME TO WALK THE SITE AND SEE WHAT NEEDS TO BE DONE. |
05/30/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADIND WORK IN PARLING AREA ON NORTH SIDE OF BUILDING. |
05/24/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON NORTH SIDE OF SITE PARKING AREA. |
05/14/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE AT THIS TIME. |
03/01/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |