Permit: DP17-0238
Permit Details
Status:
Issued
Type:
Development Package
Address:
1218 E BLACKLIDGE DR
Address NEW:
1218 E BLACKLIDGE DR
Apply Date:
09/26/2017
Applicant:
Description:
SITE/GRADING - BLACKLIDGE DEVELOPMENT, UNITS 1-13
Permit Reviews
Permit Number - DP17-0238
Permit Status: Issued
Permit Description: SITE/GRADING - BLACKLIDGE DEVELOPMENT, UNITS 1-13
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/04/2018 | DEV PKG - RESUBMITTAL | 01/05/2018 | ACTIVE |
| 09/26/2017 | DEV PKG - OK TO SUBMIT | 09/26/2017 | COMPLETED |
| 09/26/2017 | DEV PKG | 11/28/2017 | COMPLETED |
| 11/28/2017 | DEV PKG - RESUBMITTAL | 12/01/2017 | COMPLETED |
| 12/01/2017 | DEV PKG - RESUBMITTAL | 01/04/2018 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP17-0238
Permite Description: SITE/GRADING - BLACKLIDGE DEVELOPMENT, UNITS 1-13
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2018 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 03/05/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} |
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP17-0238
Permit Description: SITE/GRADING - BLACKLIDGE DEVELOPMENT, UNITS 1-13
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/06/2018; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 AC THEREFORE NO SWPPP IS REQUIRED; HOWEVER THE CONTRACTOR MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION PER COT. 2) ALL BELOW GRADE OR RE-ENFORCING WORK MUST BE INSPECTED PRIOR TO COVER. 3) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS AND OR CHANGES TO PLANS} ; {Activity date: 02/05/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - POSTPONED UNTIL 2/5/18} |
|
| 04/17/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/17/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - } | |
| 04/17/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 04/17/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - } | |
| 05/20/2019 | ENGR Engineering Final | Passed | {Activity date: 05/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 04/30/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Dave and I met with Jason from star consulting and Wyatt from Janc Correct the slope on the accessible sidewalks. Install short term bicycle parking. Stake the trees and remove nursery stakes Address roof drainage as it appears to dump onto walkways.} ; {Activity date: 04/29/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - No change since last inspection. I spoke with Louis from corner stone homes, and I explained to him that the contractor needs to install the work per plan. If there’s a problem with the plan they need to ask the engineer how to make the correction. Louis cancel the inspection.} ; {Activity date: 04/26/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Louis with corner stone homes said that they are still working toward a solution to correct the issue. There is been no change made since last inspection.} ; {Activity date: 04/17/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - Accessible sidewalk cross slopes exceed the 2% specified on page 3 of your plan in front of the garage door openings. } |