Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 04/30/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Dave and I met with Jason from star consulting and Wyatt from Janc
Correct the slope on the accessible sidewalks. Install short term bicycle parking. Stake the trees and remove nursery stakes
Address roof drainage as it appears to dump onto walkways. |
| 04/29/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - No change since last inspection. I spoke with Louis from corner stone homes, and I explained to him that the contractor needs to install the work per plan. If there’s a problem with the plan they need to ask the engineer how to make the correction. Louis cancel the inspection. |
| 04/26/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Louis with corner stone homes said that they are still working toward a solution to correct the issue. There is been no change made since last inspection. |
| 04/17/2019 |
ENGR Engineering Final
|
BBENEDON |
Denied |
Entered by CMURPHY1 - Accessible sidewalk cross slopes exceed the 2% specified on page 3 of your plan in front of the garage door openings.
|
| 05/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 04/30/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Dave and I met with Jason from star consulting and Wyatt from Janc
Correct the slope on the accessible sidewalks. Install short term bicycle parking. Stake the trees and remove nursery stakes
Address roof drainage as it appears to dump onto walkways. |
| 04/29/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - No change since last inspection. I spoke with Louis from corner stone homes, and I explained to him that the contractor needs to install the work per plan. If there’s a problem with the plan they need to ask the engineer how to make the correction. Louis cancel the inspection. |
| 04/26/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Louis with corner stone homes said that they are still working toward a solution to correct the issue. There is been no change made since last inspection. |
| 04/17/2019 |
ENGR Engineering Final
|
BBENEDON |
Denied |
Entered by CMURPHY1 - Accessible sidewalk cross slopes exceed the 2% specified on page 3 of your plan in front of the garage door openings.
|