Permit: DP17-0218
Permit Details
Apply Date:
09/06/2017
Applicant:
Tri Miller
Description:
SITE/GRADE/SWPPP - VCA Valley Animal Hospital expansion.
Permit Reviews
Permit Number - DP17-0218
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - VCA Valley Animal Hospital expansion.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2018 | DEV PKG - RESUBMITTAL | 07/05/2018 | COMPLETED |
| 01/20/2021 | REVISION - - 2ND | 03/09/2021 | STOPPED |
| 03/09/2021 | REVISION - - 2ND | 03/11/2021 | COMPLETED |
| 04/02/2021 | REVISION - - 2ND | 04/29/2021 | COMPLETED |
| 05/05/2021 | REVISION - - 2ND | 06/04/2021 | COMPLETED |
| 07/26/2018 | DEV PKG - REVISION | 07/11/2019 | COMPLETED |
| 09/06/2017 | DEV PKG - OK TO SUBMIT | 09/07/2017 | COMPLETED |
| 09/07/2017 | DEV PKG | 11/16/2017 | COMPLETED |
| 11/16/2017 | DEV PKG - RESUBMITTAL | 01/05/2018 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP17-0218
Permite Description: SITE/GRADE/SWPPP - VCA Valley Animal Hospital expansion.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 05/25/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time |
| 01/19/2023 | ENGR Engineering Final | N/A | Partial Pass | The ramp on the west side of the parking lot the handicap parking lot is not compliance needs to be removed and replace |
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 06/27/2023 | ENGR Grading Final | N/A | Complete (Recurring) | Contractor placing AB IN THE PARKING LOT .WILL PAVE ON THURSDAY. |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0218
Permit Description: SITE/GRADE/SWPPP - VCA Valley Animal Hospital expansion.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/23/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 05/02/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/02/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } ; {Activity date: 08/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 05/02/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 05/02/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } | |
| 05/25/2023 | SITE - Stormwater Final Inspection | Passed | ||
| 07/11/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 07/11/2023 | SITE - Stormwater Follow-up | Passed | ||
| 07/17/2023 | ENGR Engineering Final | Passed | ||
| 07/17/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 10/16/2023 | ENGR Grading Final | Passed |