Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP17-0218

Parcel: 13101040A


Addresses:

4984 E 22ND ST

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
05/18/2022 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VVERA1 - PARTIAL
02/15/2022 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by VVERA1 - ISNOT READY AT THIS TIME, NONE OF THE SITE HAS BEEN COMPLETED AT THIS TIME. THE CONTRACTOR IS ANTICIPATING THE SITE WORK CONTINUING FOR ANOTHER YEAR.
05/18/2022 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VVERA1 - PARTIAL
02/15/2022 ENGR Engineering Final DROBERTS Partial Approval Entered by VVERA1 - IS PARTIAL, OK FOR TCO FOR EMPLOYEES ONLY TRAINING PENDING ALL OTHER INSPECTIONS BY THE TUCSON DEPARTMENT, ANDTHE BUILDING FINAL INSPECTORS. THIS SITE STILL NEEDS TO HAVE THE EXTERIOR WORK DONE THROUGHOUT THE SITE, BUT MAY BE OPERATIONAL IF THEY CAN PROVIDE ACCESS POINTS IN/OUT OF THE BUILDING THAT WILL SATISFY THE REQUIRED SAFETY THAT IS NEEDED. I HAVE ADVISED THE CONTRACTOR THAT THEY WILL NEED TO PROTECT THE GENERAL PUBLIC FROM ENTERING ANY AREAS UNDER CONSTRUCTION OR AREAS WHERE CONSTRUCTION MATERIALS ARE TO BE STORED.
04/22/2021 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VLEON1 - PARTIAL BACK SIDEWALK POURED
12/04/2019 ENGR Engineering Final RLEDONNE Partial Approval Entered by SFLORES2 - OK for TCO for shell building only.
11/06/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - complete all work on development package for finals.
01/19/2023 ENGR Engineering Final Partial Pass The ramp on the west side of the parking lot the handicap parking lot is not compliance needs to be removed and replace
05/25/2023 ENGR Engineering Final Complete (Recurring) There is no rebar in the floor for the trash enclosure contractor was using wire mesh. Needs to remove the wire mesh and install number four rebar on a 1 foot centers
07/11/2023 ENGR Engineering Final Not Ready contractor still has excavating going on for landscaping without any barricades around in the parking lot. Where they would like to open up landscapers are installing riprap and DG on the south end of the project contractor also informed me that they would call me in for reinspection sometime this week.
07/11/2023 ENGR Engineering Final Passed
07/13/2023 ENGR Engineering Final Partial Pass Complete the site is on the approved plans
07/17/2023 ENGR Engineering Final Passed