Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 05/18/2022 |
ENGR Engineering Final
|
MHERNANDEZ |
Partial Approval |
Entered by VVERA1 - PARTIAL |
| 02/15/2022 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by VVERA1 - ISNOT READY AT THIS TIME, NONE OF THE SITE HAS BEEN COMPLETED AT THIS TIME. THE CONTRACTOR IS ANTICIPATING THE SITE WORK CONTINUING FOR ANOTHER YEAR. |
| 05/18/2022 |
ENGR Engineering Final
|
MHERNANDEZ |
Partial Approval |
Entered by VVERA1 - PARTIAL |
| 02/15/2022 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by VVERA1 - IS PARTIAL, OK FOR TCO FOR EMPLOYEES ONLY TRAINING PENDING ALL OTHER INSPECTIONS BY THE TUCSON DEPARTMENT, ANDTHE BUILDING FINAL INSPECTORS.
THIS SITE STILL NEEDS TO HAVE THE EXTERIOR WORK DONE THROUGHOUT THE SITE, BUT MAY BE OPERATIONAL IF THEY CAN PROVIDE ACCESS POINTS IN/OUT OF THE BUILDING THAT WILL SATISFY THE REQUIRED SAFETY THAT IS NEEDED.
I HAVE ADVISED THE CONTRACTOR THAT THEY WILL NEED TO PROTECT THE GENERAL PUBLIC FROM ENTERING ANY AREAS UNDER CONSTRUCTION OR AREAS WHERE CONSTRUCTION MATERIALS ARE TO BE STORED. |
| 04/22/2021 |
ENGR Engineering Final
|
MHERNANDEZ |
Partial Approval |
Entered by VLEON1 - PARTIAL BACK SIDEWALK POURED |
| 12/04/2019 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by SFLORES2 - OK for TCO for shell building only. |
| 11/06/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - complete all work on development package for finals. |
| 01/19/2023 |
ENGR Engineering Final
|
|
Partial Pass |
The ramp on the west side of the parking lot the handicap parking lot is not compliance needs to be removed and replace |
| 05/25/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
There is no rebar in the floor for the trash enclosure contractor was using wire mesh. Needs to remove the wire mesh and install number four rebar on a 1 foot centers |
| 07/11/2023 |
ENGR Engineering Final
|
|
Not Ready |
contractor still has excavating going on for landscaping without any barricades around in the parking lot. Where they would like to open up landscapers are installing riprap and DG on the south end of the project contractor also informed me that they would call me in for reinspection sometime this week. |
| 07/11/2023 |
ENGR Engineering Final
|
|
Passed |
|
| 07/13/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Complete the site is on the approved plans |
| 07/17/2023 |
ENGR Engineering Final
|
|
Passed |
|