Permit: DP17-0218

Parcel: 13101040A


Addresses:

4984 E 22ND ST

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
04/12/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN
09/17/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Trash enclosure mat installed per approved plans.
07/31/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Rebar in wall OK.
05/14/2019 ENGR Grading Final RLEDONNE Partial Approval Entered by CBELL1 - First two courses of block with vertical rebar. Ready to grout. Or provide cleanouts for full height grouting
09/01/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN /GRADING THE PARKING LOT IN THE FRONT.
04/12/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN CUTTING SUB GRADE FOR THE PARKING LOT WEST OF MAIN BUILDING.
09/21/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. No grading activity at this time.
06/30/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue.no grading activity at this time working in building.
06/23/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue no work outside of building at this time.
06/01/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time.
05/21/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - No grading activity at this time.
05/06/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - No grading activity at this time.
09/06/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Met with GC on site went over plans for grading testing on approved plans.
06/26/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Checked form Boards with GC for sidewalk on the east side of building.
08/23/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
09/01/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN
03/30/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - NA
08/06/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time all work being done inside building.
09/17/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME.
01/10/2023 ENGR Grading Final Complete (Recurring) Contractor not on site for inspection Reschedule
01/12/2023 ENGR Grading Final Not Ready Contractors not on site gates are locked I need to reschedule
03/13/2023 ENGR Grading Final Complete (Recurring)
04/07/2023 ENGR Grading Final Not Ready I looked at the wall footers On the south side of the property from the trash enclosure to the east. These footers appear to be built accordingly for the placement of rebar and the width of the footer itself. The contractor will be placing concrete next week. I also looked around the site for general site construction there appears to be no concerns at this time. Contractor continues to work on the wall, and the trash enclosure itself.
05/25/2023 ENGR Grading Final Complete (Recurring) Contractor installed wire mesh instead of number four rebar for the floors for trash enclosure. Need to remove wire mesh and replace it with a number four bars.
06/27/2023 ENGR Grading Final Complete (Recurring) Contractor placing AB IN THE PARKING LOT .WILL PAVE ON THURSDAY.
07/11/2023 ENGR Grading Final Not Ready complete all work on site including the landscaping
07/17/2023 ENGR Grading Final Passed
10/16/2023 ENGR Grading Final Passed