Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
1538 E 22ND ST
Apply Date:
06/29/2017
Applicant:
Description:
SITE/GRADING/SWPPP - EL RIO - CHERRYBELL MEDICAL CENTEROriginal Approval 12/13/2017 (23 pages)

Permit Reviews

Permit Number - DP17-0157
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - EL RIO - CHERRYBELL MEDICAL CENTEROriginal Approval 12/13/2017 (23 pages)
Start Date Submittal Complete Date Status  
06/29/2017 DEV PKG - OK TO SUBMIT 06/29/2017 COMPLETED Review Details
06/29/2017 DEV PKG 08/10/2017 COMPLETED Review Details
08/25/2017 DEV PKG - RESUBMITTAL 12/07/2017 COMPLETED Review Details
12/07/2017 DEV PKG - RESUBMITTAL 12/18/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0157
Permit Description: SITE/GRADING/SWPPP - EL RIO - CHERRYBELL MEDICAL CENTEROriginal Approval 12/13/2017 (23 pages)
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/02/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/02/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/15/2018 COT - ENGR - Signage Final Passed {Activity date: 02/15/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/10/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/10/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/07/2019 SITE - Stormwater Follow-up Passed {Activity date: 02/07/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 10/17/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time} ; {Activity date: 10/10/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - there are no issues at this time} ; {Activity date: 09/17/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 09/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALLING CURBING ON SOUTH SIDE PARKING.} ; {Activity date: 07/25/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 07/12/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS FOR THIS SITE AT THIS TIME} ; {Activity date: 06/28/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE VISIT NO CONCERNS AT THIS TIME} ; {Activity date: 05/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 04/30/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 04/19/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER REPAIRS NEEDED TO BE MAKE.} ; {Activity date: 03/06/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CREWS ARE CLEANING ROADWAYS AS NEEDED} ; {Activity date: 02/20/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/30/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/18/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/09/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/04/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - FENCE ON WEST SIDE OF SITE DOWN.}
04/18/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/18/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/18/2019 ENGR Engineering Final Passed {Activity date: 04/18/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/07/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - The depressed landscaped areas shown on page 15 do not appear to be depressed to the extent shown on the plan, in addition the depressed area on the south side of the building is higher than the drain pipe outlet and rip rap Areas at the drain pipe outlet still retain water for several days after the rain according to the security guard on site. In addition there is mud caked on the bottom of the riprap to indicate this. I have seen no letter certifying grade or elevations.
The dirt area of phase 2 does not appear to have been stabilized.
There is some Dirt in the Southern most parking spaces} ; {Activity date: 02/08/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 02/07/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
04/18/2019 ENGR Grading Final Passed {Activity date: 04/18/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/28/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE CREWS ARE WORKING ON THE CSP PIPES THAT RUN FROM THE EAST TO THE WEST. THESE PIPES ARE APPROVED AT THIS TIME FOR THE PLACEMENT OF BACKFILL.} ; {Activity date: 02/15/2018; Status: Not Applicable; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/27/2017; Status: Not ready for Inspection; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - NO AP PLANS ON SITE. GOT WITH GC ABOUT HOLDING A PRE- CON MEETING.}
04/18/2019 SITE - Stormwater Final Inspection Passed {Activity date: 04/18/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/07/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - OK pending notice of termination.} ; {Activity date: 02/07/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Provide NOT. A correction is needed at the West drainage catch basin} ; {Activity date: 01/10/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT APPLICABLE AT THIS TIME, UNABLE TO CLOSE DUE TO ADDITIONAL WORK IS STILL NEEDED.} ; {Activity date: 01/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS .}
04/18/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 04/18/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/03/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR ONSITE CHANGES OF THE CONTROLS ALONG THE EASTERN SIDE OF THE SITE.} ; {Activity date: 01/02/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_SWPPP_1 OF 1.TIF DEVELOPMENT PACKAGE VIEW
003_SHEET 1 OF 1.TIF DEVELOPMENT PACKAGE VIEW
002_COVER SHEET_1 OF 23.TIF DEVELOPMENT PACKAGE VIEW
003_NOTES_2 OF 23.TIF DEVELOPMENT PACKAGE VIEW
004_NOTES_3 OF 23.TIF DEVELOPMENT PACKAGE VIEW
005_PROPERTY PLAN_4 OF 23.TIF DEVELOPMENT PACKAGE VIEW
006_SITE (NORTH)_5 OF 23.TIF DEVELOPMENT PACKAGE VIEW
007_SITE (SOUTH)_6 OF 23.TIF DEVELOPMENT PACKAGE VIEW
008_GRADING / DRAINAGE (NORTH)_7 OF 23.TIF DEVELOPMENT PACKAGE VIEW
009_GRADING / DRAINAGE (SOUTH)_8 OF 23.TIF DEVELOPMENT PACKAGE VIEW
010_UTILITIES / EASEMENTS (NORTH)_9 OF 23.TIF DEVELOPMENT PACKAGE VIEW
011_UTILITIES / EASEMENTS (SOUTH,1)_10 OF 23.TIF DEVELOPMENT PACKAGE VIEW
012_UTILITIES / EASEMENTS (SOUTH,2)_11 OF 23.TIF DEVELOPMENT PACKAGE VIEW
013_DETAILS_12 OF 23.TIF DEVELOPMENT PACKAGE VIEW
014_NPPP_13 OF 23.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE SITE_14 OF 23.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE (NORTH)_15 OF 23.TIF DEVELOPMENT PACKAGE VIEW
017_LANDSCAPE (SOUTH)_16 OF 23.TIF DEVELOPMENT PACKAGE VIEW
018_GROUND TREATMENT (NORTH)_17 OF 23.TIF DEVELOPMENT PACKAGE VIEW
019_GROUND TREATMENT (SOUTH)_18 OF 23.TIF DEVELOPMENT PACKAGE VIEW
020_IRRIGATION (NORTH)_19 OF 23.TIF DEVELOPMENT PACKAGE VIEW
021_IRRIGATION (SOUTH)_20 OF 23.TIF DEVELOPMENT PACKAGE VIEW
022_WATER HARVESTING_21 OF 23.TIF DEVELOPMENT PACKAGE VIEW
023_LANDSCAPE / IRRIGATION DETAILS_22 OF 23.TIF DEVELOPMENT PACKAGE VIEW
024_IRRIGATION DETAILS_23 OF 23.TIF DEVELOPMENT PACKAGE VIEW
WASTEWATER P17WS00062 1ST SUBMITTAL CHERRYBELL MEDICAL CENTER - REDLINES.PDF DOCUMENTS VIEW
1A_DP17-0157_EL RIO-CHERRYBELL_ADDRESSING.PDF DOCUMENTS VIEW
FACILITIES MAP - EL RIO.PDF DOCUMENTS VIEW
2D_EL_RIO_SUPP_GER.PDF DOCUMENTS VIEW
2C_EL_RIO_GER.PDF DOCUMENTS VIEW
2F_DRAINAGE_STATEMENT_EL_RIO_22ND.PDF DOCUMENTS VIEW
2G_EL_RIO_SWPPP_2017-08-17.PDF DOCUMENTS VIEW
2M_TDOT_LANDSCAPE_BUFFER_WITHIN_ROW.PDF DOCUMENTS VIEW
2H_EL_RIO_22ND_&_KINO_CRL_DP_1ST_SUB.PDF DOCUMENTS VIEW
3D_CRL_DP_2ND_SUBMITTAL_2017-12-05.PDF DOCUMENTS VIEW
3F_DRAINAGE_STATEMENT_ADDENDUM_2017-11-21.PDF DOCUMENTS VIEW
RESPONSE TO REZONE CONDITIONS.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW