Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP17-0157

Parcel: 129101290


Addresses:

1538 E 22ND ST


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0157

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
02/07/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
02/07/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
12/20/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - SITE AT THIS TIME IS NOT READY FOR TCO.#1 PROVIDE ACCESS FROM STREET. #2 COMPLET ALL STRIPING #3 REMOVEALL CONSTRUCTION EQUIPMENT FROM PARKING AREAS. #4 LIST IS NOT COMPLET. COMPLET ALL WORK ON AP PLANS DP17-0157 FOR OUT SIDE BUILDING.
11/20/2018 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Working on Paving on South side parking area.
10/17/2018 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - grading intermediate, continued. Three-quarter inch conduit installed for South light pole. Use combination permit and inspection code 02010 for the remainder of the lighting Electric
10/10/2018 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - curbs have been installed
09/17/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CREWS CONTINUE TO WORK ON THE INSTALLATION OF CURBS THROUGHOUT THE SITE.
06/28/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CONTRACTOR WORKING ON THE BACKFILL MATERIAL BEING PLACED OVER THE SEWER LINES. THEY WILL BE PLACING CONCRETE OVER THE STORN DRAIN PIPES AND THE SEWER PIPES
06/21/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - INSPECTED THE NEW 6 INCH SEWER LINE OVER THE EXISTING DRAINAGE PIPES SOUTH OF THE BUILDING. THE PIPE WLL BE TRANSITIONING FROM HDP TO METAL BACK TO HDP. IN THIS AREA THEY WILL BE ENCASING ALL OF THE PIPES WITH CONCRETE, THIS WORK WILL BE DONE TOMORROW.
04/03/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - MINOR WORK ON SITE ADDING SOME FILL MATERIAL ALONG THE EAST SIDE FROM THE STOCKPILE. I HAVE REMINDED THE CONTRACTOR THAT THEY NEED TO BE SCHEDULING THE STORMWATER EVERY 2 WEEKS ON THIS SITE TILL THEY HAVE STARTED GOING VERTICAL AND ARE PREPARING THE SUBGRADE FOR ABC.
03/06/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED OVER THE AREA WHERE THEY ARE POURING THE CONCRETE FOR THE GRADE BEAM. THE CONCRETE IS POURED PARRALLEL TO THE PIPE AND A GRADE BEAM WILL BE PLACED ON TOP OF THIS AT A LATER DATE. THIS AN APPROVAL THAT HAS BEEN APPROVED BY ERIC NEWCOMB WITH PDSD, THE GRADE BEAM WILL BE PLACED AT A LATER DATE.
02/15/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR IS WORKING ON THE INSTALLATION OF THE DRAINAGE PIPE ON THE WEST SIDE OF THE SITE. THIS PIPE FALL UNDERNEATH THE BUILDING SLAB AND NEEDS TO BE DONE PER THE APPROVED RECOMMENDATIONS FROM THE SUPPLIER. CURRENTLY THEY ARE TRYING TO UTILIZE THE USE OF MAR MAC TAPE FOR THE JOINT BETWEEN DUCTILE IRON PIPE AND HDPE. I HAVE ASKED BFL TO PROVIDE US WITH THE MANUFACTORERS SPECIFICATION SHEETS FOR THE JOINING OF TWO DIFFERENT TYPES OF PIPE.
04/18/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
02/28/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS ARE WORKING ON THE CSP PIPES THAT RUN FROM THE EAST TO THE WEST. THESE PIPES ARE APPROVED AT THIS TIME FOR THE PLACEMENT OF BACKFILL.
02/15/2018 ENGR Grading Final DROBERTS Not Applicable Entered by DROBERT5 -
12/27/2017 ENGR Grading Final RLEDONN1 Not ready for Inspection Entered by RLEDONN1 - NO AP PLANS ON SITE. GOT WITH GC ABOUT HOLDING A PRE- CON MEETING.
04/18/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
07/25/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - LOOKED AT THE REBAR FOR THE FOUNDATIONS ON THE SOUTH SIDE OF THE BUILDING IN THE MECHANICAL AREA AND THE TRASH ENCLOSURE FLOOR
07/21/2018 ENGR Grading Final IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
07/12/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE REBAR DOR THE SCUPPER THAT DRAINS THROUGH THE HEADWALL LOCATED AT THE SOUTHWEST CORNER OF THIS SITE. THIS STRUCTURE IS OK TO POUR AT THIS TIME
06/14/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - THIS SITE IS OKAY AT THIS TIME TO POUR THE FOOTER FOR THE TRASH ENCLOSURE.
06/05/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 - CATCH BASIN ON NORTH WEST SIDE OF SITE REBAR OK.
05/15/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - OK TO POUR THE HEAD WALLS FOR THE DRAINAGE PIPES
05/07/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - PARTIAL APPROVAL FOR THE HEADWALL FOR BOTH ENDS OF THE DRAINAGE PIPES. THIS AREA WAS PREVIOUSLY INSPECTED BY RAY CAMACHO ON 5/4/18
05/07/2018 ENGR Grading Final MRUSSO Cancelled Entered by DROBERT5 -