Permit: DP17-0157

Parcel: 129101290


Addresses:

1538 E 22ND ST


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP17-0157

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/18/2019 ENGR Engineering Final DROBERTS Approved Entered by CBELL1 -
03/07/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - The depressed landscaped areas shown on page 15 do not appear to be depressed to the extent shown on the plan, in addition the depressed area on the south side of the building is higher than the drain pipe outlet and rip rap Areas at the drain pipe outlet still retain water for several days after the rain according to the security guard on site. In addition there is mud caked on the bottom of the riprap to indicate this. I have seen no letter certifying grade or elevations. The dirt area of phase 2 does not appear to have been stabilized. There is some Dirt in the Southern most parking spaces
02/08/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - Pedestrian striping has been completed Superintendent is not on site, I left my phone number on his desk. Work is ongoing, landscapers are hard at it, job trailer dumpsters, toilets are still on site. There is dirt and other debris that still needs to be cleaned up
02/07/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - Engineering inspection has no issues preventing a temporary CFO for development package. A letter certifying the site grading may be required. Revisions for all changes made. Complete walkway striping. Provided stabilization at phase 2 area. Correct cross slope of DG walkwayIn locations identified. We have standing water into accessible parking spaces on the north side of the property. We have standing water at the grouted riprap areas. Water harvesting areas are not depressed as shown on plan. Note there is water that is not draining from these areas after 24 hours. Complete all landscaping, steak the trees etc. Note the slope of the parking spaces concrete and asphalt paths are OK
11/20/2018 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by CBELL1 - complete all work on approved plans for engineering final.
04/18/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
03/07/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - The depressed landscaped areas shown on page 15 do not appear to be depressed to the extent shown on the plan, in addition the depressed area on the south side of the building is higher than the drain pipe outlet and rip rap Areas at the drain pipe outlet still retain water for several days after the rain according to the security guard on site. In addition there is mud caked on the bottom of the riprap to indicate this. I have seen no letter certifying grade or elevations. The dirt area of phase 2 does not appear to have been stabilized. There is some Dirt in the Southern most parking spaces
02/08/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 -
02/07/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 -