Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9036 S HOUGHTON RD
Apply Date:
03/10/2017
Applicant:
Tri Miller
Description:
SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/

Permit Reviews

Permit Number - DP17-0051
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/
Start Date Submittal Complete Date Status  
03/10/2017 DEV PKG - OK TO SUBMIT 03/10/2017 COMPLETED Review Details
03/10/2017 SITE and/or GRADING 04/18/2017 COMPLETED Review Details
04/18/2017 RESUB - SITE and/or GRADING 04/18/2017 COMPLETED Review Details
04/18/2017 RESUB - SITE and/or GRADING 08/17/2017 COMPLETED Review Details
08/18/2017 REVISION - SITE 09/05/2017 COMPLETED Review Details
10/25/2017 REVISION - - 2ND 10/25/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0051
Permit Description: SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/17/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN, UNLESS SITE INSPECTIONS SHOW REASON FOR REMOVAL
2) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM PER YOUR PERMIT
3) INSTALL A CONCRETE WASH OUT ON SITE
4) POST A COPY OF YOUR NOI ON SITE
5) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND SITE/GRADING/LANDSCAPING WORK
6) CALL FOR INSPECTION FOR ANY QUESTIONS OR CONCERNS WITH THE SITE}
09/01/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 09/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED} ; {Activity date: 08/17/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS ARE IN PLACE
2) A STABILIZED CONSTRUCTION ENTRANCE IS IN
3) POST YOUR NOI
4) INSTALL A CONCRETE WASH OUT
5) PERFORM SELF INSPECTIONS}
05/17/2018 SITE - Stormwater Follow-up Passed {Activity date: 05/17/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/25/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROGRESS INSPECTION, WALKED SITE WITH SUPERINTENDENT.
NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 03/08/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/30/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 09/01/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
05/17/2018 ENGR Grading Final Passed {Activity date: 05/17/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/17/2018 SITE - Stormwater Final Inspection Passed {Activity date: 05/17/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ}
05/31/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/31/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/31/2018 ENGR Engineering Final Passed {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/31/2018 COT - ENGR - Signage Final Passed {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }