Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel141186030
14118008J
141186320
JurisdictionTucson
City of Tucson ZoningC-1
Airport Environs Zone

Tucson International AEZ Paddle

Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Streets & Routes

Scenic Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 9036 S HOUGHTON RD
Date - 11/24/2024 4:41 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-64-84 Area 7 6142 6143

Special Development Requests & Requirements

Address: 9036 S HOUGHTON RD
Date - 11/24/2024 4:41 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Unit Type Description
T18SA00262 VOID 06/21/2018 N/A Design Review Board (STILL UNDERGOING PLAN REVIEWS - PUTTING IN VOID STATUS SO AS NOT TO CONFUSE DATE OF SUBMITTAL - HAS NOT HAPPENED YET AS OF 7/17/18 - HAD MEETING 7/16/18 WITH APPLICANTS AND DEVELOPERS) MASTER SIGN PROGRAM PROPOSAL FOR NEW FREESTANDING SIGNAGE ALONG HOUGHTON, OLD VAIL AND WITHIN THE DEVELOPMENT.
T18SA00369 APPROVED 08/22/2018 N/A Design Review Board

Permits

Address: 9036 S HOUGHTON RD
Date - 11/24/2024 4:41 a.m.
Total Number Of Permits - (30)
Permit Status Apply Date Expired Date Unit Type Description
TS-PRM-1023-00584 Inspections Complete 10/24/2023 04/08/2025 Sign - Permanent (Pending TRE - RES 2024 - 003 / Master Sign Program TS-MSP0423-0008 / location, height, sign area) Install one lighted freestanding sign
TF-FCP-0924-00789 Void 09/13/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0924-00743 - Adding Starlink Cellular Dialer to an existing system
TF-FCP-0924-00743 Inspections 09/03/2024 04/14/2025 Fire Construction Permit Adding Starlink Cellular Dialer to an existing system
TR-ROW-0724-00872 Needs Resubmittal 07/31/2024 N/A Right-of-Way (ROW) Raised Pavement Markings Installation - (Note: Installation of New RPM's on Mary Ann Cleveland Way Eastbound between Houghton and Rincon Knolls Loop. Roadway Centerline will be Converted to Double Yellow prior to the Installation of RPM's)
TR-ROW-0723-00933 Complete 07/07/2023 08/30/2023 Right-of-Way (ROW) Installation of underground conduit to connect existing City OF Tucson IT pathways. install fiber to connect the new VAIL water site to the City Network.
T18OT00607 Expired 06/06/2018 10/21/2020 Sign - Permanent SEVERAL FREESTANDING SIGNS - INTENDED FOR A MASTER SIGN PROGRAM REVIEW
T18OT00466 Issued 05/02/2018 12/03/2018 Sign - Permanent 3 - illum wall signs
DP17-0051 Complete 03/10/2017 11/27/2018 Development Package SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/
TS-PRM-0323-00218 Issued 03/03/2023 04/08/2025 Sign - Permanent Install 3 freestanding signs and 2 tenant panels to existing monument sign. (Master Sign Program TS-MSP0423-00008) & TRE issued
T20OT00154 Issued 02/13/2020 08/25/2020 Sign - Permanent sign
T12OT01651 EXPIRED 12/10/2012 04/28/2014 SIGN 2- FREESTANDING SIGNS / VARIANCE CASE # S-08-22
T13OT00547 EXPIRED 05/06/2013 04/27/2014 SIGN (2) ILLUMINATED MONUMENT SIGNS AT 35 SQFT EACH (OFF HOUGHTON FRONTAGE)
T14OT00225 EXPIRED 02/20/2014 09/21/2014 SIGN SIGN (9 ILLUM TRAFFIC DIRECTIONALS 5' TALL AT 10.5 SQFT EACH PER VARIANCE S-08-022 FOR HOUGHTON TOWN CENTER)
T15TC01998 FINAL 08/28/2015 N/A BARRICAD Starting at the N/W corner of Houghton Rd and Mary Ann Cleveland Way, pull fiber in existing conduit going east 2348ft (see attachment). Project# 41505150000PERMITS
T16RW02892 FINAL 11/22/2016 01/28/2017 ROW INSTALLATION OF UNDERGROUND 3 1-1/4" CONDUIT WITH FIBER OPTIC CABLE FROM ABOUT RITA TO HOUGHTON SEE SHEET 8,9, 10 & 11 PER T16PI00021 PLAN MUST MEET WITH GARY WITTWER PRIOR TO WORK. ADDRESS ON APPLICATION-RITA RD TO OLD VAIL RD
T17CM03846 C OF O 05/15/2017 12/29/2018 COMBO FINANCIAL INSTITUTION BRANCH
T17CM03953 EXPIRED 05/18/2017 02/17/2018 COMBO NEW PRIVATE SEWER LINE
T17CM05000 FINAL 06/27/2017 02/28/2018 COMBO TEMP CONSTRUCTION TRAILER, POWER & FENCE
T17CM06054 EXPIRED 08/08/2017 12/22/2018 COMBO FOUNDATION ONLY - NEW BANK
T17FC00692 FINAL 08/22/2017 03/18/2018 FIRECONS NEW CONSTRUCTION OF A 6200 S.F. CREDIT UNION - INSTALLATION OF A NEW 6' FIRE LINE.
T17FC00777 FINAL 09/25/2017 12/18/2018 FIRECONS INSTALL NEW FIRE PROTECTION SYSTEM FOR HUGHES FCU AT THE LOCATION SHOWN.
T17OT00165 FINAL 02/13/2017 03/19/2018 SIGN 1- ILLUM DF / ON OLD VAIL ROAD / ALLOWED PER VARIANCE CASE S-08-22
T18FC00226 VOID 03/15/2018 N/A FIRECONS INSTALLATION OF VOLUNTARY FIRE ALARM SYSTEM (34 SMOKES, 19 AUDIO VISUAL DEVICES, 1 DUCT DET, AND 2 PULL STATIONS).
T18FC00229 FINAL 03/15/2018 12/18/2018 FIRECONS TIE-IN OF NEW DEVICES INTO EXISTING SYSTEM.
T18FC00495 FINAL 06/12/2018 12/18/2018 FIRECONS WE HAVE ADDED A TELGUARD UNIT TO MONITOR THE FIRE ALAMR SYSTEM.
T18RW00888 FINAL 02/22/2018 05/20/2018 ROW MANHOLE ACCESS - NO EXCAVATION
T18RW01770 FINAL 04/19/2018 05/27/2018 ROW OVERLASH 350' OF FIBER ON EXISTING POWER POLES, DIRT TRENCH 100', PLACE 2" PVC CONDUIT FOR LEVEL 3 COMMUNICATION.
T19RW01978 FINAL 04/11/2019 07/14/2019 ROW REPLACING TWO (2) CONCRETE VAULTS OVER KINDER MORGAN GAS VALVES ON THE S/EAST CORNER OF HOUGHTON RD, SOUTH OF OLD VAIL RD.
T21RW01185 FINAL 03/15/2021 06/20/2021 ROW N.843654- ALONG S. HOUGHTON ACCESS MH 46984 TO SPLICE SPLICE CABLES IN EXISTING HANHOLE.
T21RW03328 FINAL 07/14/2021 08/14/2021 ROW JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REPLACING A DAMAGED LIGHT POLE ON THE SOUTHWEST CORNER OF HOUGHTON ROAD AND OLD VAIL ROAD. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS.

Plans

Address: 9036 S HOUGHTON RD
Date - 11/24/2024 4:41 a.m.
Total Number Of Plans - (4)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-17-0051 Active 03/10/2017 11/27/2018 -- Commercial Water Harvesting Ordinance SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/
T16PI00021 Approved 11/02/2016 05/02/2017 -- Private Improvement Agreement RITA RD & OLD VAIL RD
TR-RES-0623-00004 In Review 06/30/2023 N/A -- Real Estate Services Install one double-sided lighted monument sign
TS-MSP0423-00008 Approved 04/05/2023 N/A -- Master Sign Program Install 3 lighted monument signs and 2 (several variations from scenic / 28' height, sign area at 113 sqft, reduced setback) additional faces to existing monument sign.

Record Requests

Address: 9036 S HOUGHTON RD
Date - 11/24/2024 4:41 a.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-0124-00906 Void 01/31/2024 02/12/2024 Requests Permit TS-PRM-0323-00218 (9036 S HOUGHTON RD ) expires on July 30, 2024 - no need for the extension at this time) It took us awhile to get the TRE for this job so we are just getting ready to install next week. We would like to do the hole inspections either 2/1 or 2/2. Install 3 freestanding signs and 2 tenant panels to existing monument sign. (Master Sign Program TS-MSP0423-00008)